Laserfiche WebLink
AMERICAN Em%fIRONMENTAL MANAGEMENT UORPORATION <br /> Project Newark Sierra -Pipeline Closure Job No. 81051 Boring PL-5 Sheet 1 of 1 <br /> Date Started 7/5/90 at 1510 Completed 7/5/90 at 1530 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline, on loading dock. <br /> Logged By Mike Stephens Drilled By B & F Drilling <br /> Remarks Drilled at 300 angle. SS = California Modified Split Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G 0 H <br /> T E S 6 H E V I <br /> I R E C <br /> 0 1 (ft) R <br /> N I N Y <br /> 0 6.5-of Asphalt,4'AB gravel. <br /> — 1 10.5"-6' CLAY,some silt and fine sand,medium plasticity,slightly stiff,very moist, <br /> gray(N4/N3),(CL). <br /> — 2 <br /> — 3 <br /> — — 5 <br /> 6 6-8' CLAY,brown (5YR4/4),(CL). <br /> — 7 <br /> Color changes at 8'to light brown (5YR5/6). <br /> — 8 <br /> --to <br /> 9 <br /> 11 SS PL5-A i 11- <br /> 12 11.5' End of boring. <br /> — 13 <br /> — 14 <br /> — 15 <br /> — 16 <br /> — 17 <br /> — 18 <br /> — 19 <br /> — 20 <br /> — 21 <br /> — 23 <br /> — 24 <br /> — 25 <br /> — ern�m(�zs <br />