Laserfiche WebLink
AMERICAN EAwiRONMENTAL MANAGEMENT C%APORATION <br /> Project • Newark Sierra- Pioeline Closure Job No. 81051 Boring PL-9 Sheet 1 of 1 <br /> Date Started 7/6/90 Completed 7/6/90 at 1140 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on loadina dock <br /> Logged By Mike Stephens Drilled By B &F Drillina <br /> Remarks Drilled at 30° angle SS = California Modified Split Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A 1 E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G 0 H <br /> T E S 6 H E V I <br /> I R E C <br /> O 1 (it) R <br /> N N Y <br /> 5-Asphalt,4-AS gravel. <br /> / e'-7.5' SILTY CLAY,some fine sand,sticky,medium plasticity,saturated,light <br /> _ gray(N6), (CL). <br /> 2 <br /> 3 <br /> — 5 <br /> 7 <br /> 7.5-11.5' SILTY CLOY,some fine sand,stiff,slightly moist,brown (10YR5/4), (CL). <br /> — 8 <br /> — 9 <br /> 10 <br /> 9 <br /> C <br /> --It SS PL-9A = It. 100% <br /> 12 11.5' End of boring. <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> --18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> "elve.-09(wls) <br />