Laserfiche WebLink
AMERICAN ENVIRONMENTAL MANAGEMENT CUAPORATION <br /> Project Newark Sierra- Pipeline Closure Job No. 81051 Boring PL-10 Sheet 1 of 1 <br /> Date Started 7/6/90 Completed 7/6/90 at 1140 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on loading dock <br /> Logged By Mike Stephens Drilled By B &F Drilling <br /> - Remarks Drilled at 30° angle SS = California Modified Solit Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N S P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M 0 R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G O H - <br /> - T E S 6 H E V I <br /> I R E C <br /> 0 1 (ft) R <br /> N N Y <br /> 0 5.5'of Asphalt,4-gravel. <br /> 1 9.5'-8' SILTY CLAY,some fine sand,moist,gray,slight petroleum odor, (CL). <br /> 2 <br /> 3 <br /> c <br /> — PL 10 i 4 90% <br /> 5 <br /> — 6 <br /> 7 <br /> 8 8-11.5' SILTY CLAY,some fine sand,law plasticity,dry,friable,tan (t0YR5/4), <br /> (CL). <br /> 9 <br /> 10 <br /> 9 <br /> 11 PL-10 i 11- 90% <br /> — 12 11.5' End of boring. <br /> — 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> Ol.er (.,Z 5) <br />