My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICAN E9VIRONMENTAL MANAGEMENT CdRPORATION <br /> Project Newark Sierra-Pipeline Closure Job No. 81051 Boring PL-12 Sheet 1 of 1 <br /> Date Started 7/6/90 at 0840 Completed 7/6/90 Surface Elevation <br /> Total Depth 10 feet Location Closest boring to building <br /> Logged By Mike Stephens Drilled By B &F Drilling <br /> Remarks Vertical boring. <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E 8 W T G O H <br /> T E S 6 H E V I <br /> I R E C <br /> O 1 (ft) R <br /> N N Y <br /> 0-6'Asphalt,6'-10'AS gravel,large. <br /> 1 10'-4' SILTY CLAY,medium plasticity,moist,petroleum odor,light brown, (CL). <br /> 2 <br /> 3 <br /> 4 4-8.5' SILTY CLAY,moist,slight petroleum odor,gray(N4), (CL). <br /> — 5 <br /> — 6 <br /> 7 <br /> — 8 <br /> 8.5-10' SILTY CLAY moist,tan, (CL). <br /> SS PL-12 z 9.5• 100% <br /> 10 10.0' <br /> 10' End of boring. <br /> — 11 <br /> 12 <br /> --13 <br /> 14 <br /> 15 <br /> --16 <br /> 17 <br /> 18 <br /> — 19 <br /> --20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.