Laserfiche WebLink
AMERICAN E9VIRONMENTAL MANAGEMENT CdRPORATION <br /> Project Newark Sierra-Pipeline Closure Job No. 81051 Boring PL-12 Sheet 1 of 1 <br /> Date Started 7/6/90 at 0840 Completed 7/6/90 Surface Elevation <br /> Total Depth 10 feet Location Closest boring to building <br /> Logged By Mike Stephens Drilled By B &F Drilling <br /> Remarks Vertical boring. <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E 8 W T G O H <br /> T E S 6 H E V I <br /> I R E C <br /> O 1 (ft) R <br /> N N Y <br /> 0-6'Asphalt,6'-10'AS gravel,large. <br /> 1 10'-4' SILTY CLAY,medium plasticity,moist,petroleum odor,light brown, (CL). <br /> 2 <br /> 3 <br /> 4 4-8.5' SILTY CLAY,moist,slight petroleum odor,gray(N4), (CL). <br /> — 5 <br /> — 6 <br /> 7 <br /> — 8 <br /> 8.5-10' SILTY CLAY moist,tan, (CL). <br /> SS PL-12 z 9.5• 100% <br /> 10 10.0' <br /> 10' End of boring. <br /> — 11 <br /> 12 <br /> --13 <br /> 14 <br /> 15 <br /> --16 <br /> 17 <br /> 18 <br /> — 19 <br /> --20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br />