Laserfiche WebLink
AMERICAN ENWRONMENTAL MANAGEMENT COMPORATION <br /> Project Newark Sierra Job No. 81051 Boring PL-11 Sheet 1 of 1 <br /> Date Started 7/6/90 at 0915 Completed 7/6/90 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on loading dock. <br /> Logged By Mike Stephens Drilled By B & F Drilling <br /> Remarks Drilled at 30° angle. SS = California Modified Split Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E S w T G 0 H <br /> — T E S 6 H E V I <br /> I R E C <br /> O 1 (ft) R <br /> N N Y <br /> o 5-Asphalt,4-AB gravel. <br /> 9--2' Rock,Brick.Clav mixture. <br /> 2 2-8.5' CLAY,very moist,petroleum odor,gray, (CL). <br /> — 3 <br /> — 5 <br /> — 6 <br /> — 7 <br /> 8 <br /> 8.5-11.5' SILTY CLAY,some fine sand, (CL). <br /> g <br /> 10 <br /> a <br /> c <br /> --If SS PL-11 i 11- 100% <br /> A 11 <br /> 12 11.5' End of boring. <br /> — 13 <br /> — 14 <br /> — 15 <br /> — 16 <br /> — 17 <br /> — 18 <br /> — 19 <br /> 20 <br /> — 27 <br /> 22 <br /> — 23 <br /> — 2q <br /> 25 <br /> e 1.c. (.25) <br />