My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA GEORGE DEUKMEJIAN,Governor <br /> CAJFORNIA REGIONAL WATE,.aUALITY CONTROL BOARD— �-,•_ <br /> CENTRAL VALLEY REGION w" <br /> 3443 ROUTIER ROAD x„ <br /> SACRAMENTO,CA 95827-3098 <br /> 30 September 1988IsAcr <br /> I � OCT 3 1988 <br /> ENVIRONMENTAL HEALTH <br /> Mr. Don Gagnon PERMIT/SERVICES <br /> Gold Bond Building Products 3- ULJ <br /> 800 West Church Street < C <br /> Stockton, CA 95203 <br /> REVISED REQUEST FOR VARIANCE, BASED ON A MEETING HELD ON 20 <br /> SEPTEMBER 1988, FROM THE MONITORING ALTERNATIVES IN THE UNDERGROUND <br /> TANK REGULATIONS FCR THREE TANKS AT THE GOLD BOUD BUILDING PROD'U'CTS <br /> FACILITY IN STOCKTON, CALIFORNIA <br /> We examined a proposal for a variance from the monitoring <br /> alternatives, prepared by American Environmental Management Corp. <br /> (AEMC) and, by letter dated 4 August 1988 , requested that Gold Bond <br /> provide additional data in ten areas to support the request before <br /> our review could be completed. A revised proposal was subsequently <br /> submitted which was still considered deficient. Following our <br /> response to the revised proposal, AEMC requested a meeting to <br /> review our comments. <br /> At the meeting we agreed that insufficient baseline information was <br /> presented to grant a variance for this site. If the present tanks <br /> are to continue in service, baseline data such as ground water <br /> depth, ground water gradient, detailed piping diagrams and <br /> operation, etc. , must be determined before a monitoring proposal <br /> can be considered. Various options were discussed at the meeting <br /> including abandonment and replacement of the existing tanks. It <br /> was agreed that AEMC would pursue this matter further by visiting <br /> the site and discussing the present site status with Gold Bond <br /> personnel. <br /> If you have any questions, please call 'me at (916) 361-5740. <br /> GORDON LEE BOGGS <br /> Underground Tank Program Coordinator <br /> GLB/GSJ:gj <br /> cc: ✓Ms. Laurie Cotulla, San Joaquin Local Health District, <br /> Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.