My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA GEORGE DEUKMEJIAN.Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD- ~ <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> t <br /> 8 September 1988 v� R�)jj kK <br /> Mr. Don Gagnon <br /> Gold Bond Building Products <br /> 800 West Church Street <br /> Stockton, CA 95203 <br /> REVISED REQUEST FOR VARIANCE FROM THE MONITORING ALTERNATIVES IN <br /> THE UNDERGROUND TANK REGULATIONS FOR THREE TANKS AT THE GOLD BOND <br /> BUILDING PRODUCTS •FACILITY IN STOCKTON, CALIFORNIA <br /> We have examined the revised proposal for a variance prepared by <br /> American Environmental Management Corp. By letter dated 4 August <br /> 1988, we requested that Gold Bond provide additional data in ten <br /> areas to support the request before our review could be completed. <br /> Following are subject areas for which more detailed information is <br /> needed: <br /> - How will the line connecting the large tank to the two smaller <br /> tanks be monitored to assure that small, on-going leakage is <br /> not occurring? <br /> - Provide figures and maps which indicate the basis for location <br /> of monitoring wells (MW) and specifics of MW construction such <br /> as depth, depth of screened interval, screen size, filter <br /> pack, etc. , <br /> - The proposal states that two MWs will be installed near the <br /> large tank, one upgradient and one downgradient. , However, <br /> according to Regional Board staff, the closest MW is about <br /> 1100 feet north of nearest tanks to be monitored, so the local <br /> gradient around the tanks to be monitored has not been <br /> determined. (A minimum of three wells are necessary to solve <br /> a "simple" gradient direction problem) . <br /> - Because the local water table is shallow, approximately 15 <br /> feet in the nearest MW (1100 feet to the north) , an <br /> interception trench may be appropriate to consider in addition <br /> to or rather than MWs. Please prepare a discussion of the <br /> options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.