My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
INSTALL_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 4:32:34 PM
Creation date
11/8/2018 10:25:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2017
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\ESCALON\1329\PR0231487\2017 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 4 . Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site , at all times while work is <br /> being performed , who possesses all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the <br /> Contractors State License Board (may be issued to the installation company) , <br /> and <br /> • A valid , current California UST Service Technician certificate issued by the <br /> International Code Council ( ICC) , and <br /> • A valid , current certificate of training from the manufacturer(s) of the component(s) <br /> being tested , repaired , or serviced , additionally , <br /> • Each person installing or testing any component must hold a certificate of training <br /> from the manufacturer of that component . <br /> 5 . All primary containment including any integral secondary containment system must be <br /> certified by an independent testing organization and labeled as required by the <br /> organization (Title 23 Chapter 16 , 2631 ( b) ; ( UL , ULC , ANSI , API , ASTM , etc . See Title <br /> 23 Chapter 16 Table B for complete list . ) Pursuant to Underwriters Laboratories Inc ( UL) <br /> listing requirements , only those products bearing the UL mark will be considered listed . <br /> ANY PART/PRODUCT NOT MARKED WITH THE UL LABEL OR ANOTHER LISTED <br /> TESTING ORGANIZATION WILL BE REJECTED . All secondary containment system <br /> which is not an integral part of the primary containment shall be designed and <br /> constructed according to an engineering specification approved by a state registered <br /> professional engineer or according to a nationally recognized industry code or <br /> engineering standard (Title 23 Chapter 16 , 2631 (d ) ) . <br /> 6 . Contact Stacy Rivera , Sr. REHS at ( 209 ) 468 =3440 or John Alaniz, EHS at ( 209 ) 468 = <br /> 3147 , for the following inspections . See the permit inspection checklist more <br /> information . All appointments must be scheduled 48 hours in advance . <br /> Completed inspections have been marked as " Completed". All items not marked <br /> as completed are still needed . <br /> ❑ Inspection of tank vacuum gauge or inspection for brine leaks prior to tank placement <br /> in excavation . All tank' s pre- installation tests shall be performed according to tank' s <br /> manufacturer instructions . Provide field-completed Containment Solutions , Inc. ( CSI ) <br /> tank installation checklist(s ) upon completion . (Completed) <br /> ❑ Verification of tank set , anchorage , backfill , and corrosion protection of tank anchors . <br /> Corrosion protection on all exposed metal prior to covering (Completed) <br /> ❑ Pressure test of the primary UST(s) containment according to manufacturer' s <br /> specifications (Completed) <br /> ❑ Primary piping soap test of all piping and penetrations (product and vent) : One- hour <br /> pneumatic pressure test at 110 % of operating pressure , or 40 psi , whichever is <br /> greater. (Completed) <br /> ❑ Secondary piping slope (at 1 /8 inch per foot or greater) to a containment sump with <br /> an audible/visual alarm . (Completed) <br /> ElSecondary piping soap test of all piping and penetrations ( product and vent) : One- <br /> hour pneumatic pressure test at the manufacturer' s recommended pressure . <br /> (Completed) <br /> ❑ Verification of pipe set backs and burial depth according to the manufacturer' s <br /> installation instructions . Verification of appropriate backfill . (Completed) <br /> Arco AM/PM, 1305 S. Escalon Ave. , Escalon, CA 95209 SR0074800 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.