My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
INSTALL_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 4:32:34 PM
Creation date
11/8/2018 10:25:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2017
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\ESCALON\1329\PR0231487\2017 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Brine addition and verification for brine leaks in the interstitial space of all sumps and <br /> UDC (s) prior to backfill . (Completed for UDCs, vent sump, and STP sumps) <br /> ❑ Verification of communication for all installed vacuum , pressure , or hydrostatic (VPH ) <br /> components <br /> ❑ Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps ( UDCs) (Completed) <br /> ❑ Enhanced Leak Detection ( ELD) testing (after facility is in operating condition ) : <br /> appropriate test notification and test method disclosure <br /> ❑ VPH components verification ( lockable lids , shroud boots , band clamps , gaskets , <br /> etc . ) <br /> ❑ Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off and/or verification that external audible/visual alarm activates when tank is <br /> 90 % full . <br /> ❑ Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent) . Proper drainage method must be verified . <br /> ❑ Monitoring system functionality prior to fuel delivery : Functionality of the monitoring <br /> system must be verified to ensure it meets the requirements of Title 23 California <br /> Code of Regulations and the Health & Safety Code (functionality of brine and liquid <br /> sensors in sumps and under dispenser containments ( UDCs) ) . (Completed) <br /> ❑ Leak detector test : Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi . (Completed) <br /> ❑ Verification of concrete thickness at the tanks for compliance with buoyancy <br /> calculations . <br /> ❑ Fill sump integrity testing after repairs . <br /> ❑ Visual inspection of the UDCs to verify construction is in a manner to prevent vapors <br /> from entering the backfill . <br /> ❑ Visual verification of adhesive removal from the 87 fill sump vacuum tube . <br /> ❑ Verification of all fuel removal from 87 product , vent , and vapor recovery vacuum <br /> monitored secondary piping ; verification that primary piping is free of leaks . <br /> ❑ Monitoring system functionality : Functionality of the monitoring system must be <br /> verified to ensure it meets the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code (functionality of vacuum and liquid " smart" <br /> sensors) . <br /> ❑ Final inspection and demonstration of automatic shut-down , as applicable . <br /> 7 . All USTs shall be anchored using deadmen as detailed in the permit application . <br /> 8 . Install concrete of sufficient thickness according to the manufacturer's written installation <br /> instructions . <br /> 9 . Install all product and vent piping according to manufacturer' s written installation <br /> instructions ; maintain all appropriate piping distances and installation depths . <br /> 10 . All monitoring systems shall be listed in the State Water Resources Control Board ' s <br /> Local Guidance Letter ( LG ) 113 letter. <br /> Arco AWPM, 1305 S. Escalon Ave. , Escalon, CA 95209 SR0074800 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.