Laserfiche WebLink
I 1 . All installation and testing shall be in compliance with manufacturer' s instructions , <br /> section 2635 and section 2636 of California Code of Regulations ( CCR) . <br /> 12 . All tank top openings that are connected to the primary space of the UST must have <br /> secondary containment , audible/visual alarm and be vapor tight or terminate at grade . <br /> 13 . Sumps and under dispenser containment must be constructed in a manner to prevent <br /> vapors from entering the backfill . <br /> 14 . All secondary containment must be constructed to prevent water intrusion . <br /> 15 . The secondary containment system must be continuously monitored as required under <br /> California Health & Safety Code ( HSC) 25290 . 1 <br /> 16 . Overfill prevention shall satisfy CCR 2635 ( b) (2 ) (C ) pursuant to the permit application . As <br /> agreed by applicant ball floats will not be used on vents for overfill prevention . <br /> 17 . Product line leak detector ( PLLD) line length measurements shall be provided to confirm <br /> the accurate monitoring panel programming . <br /> 18 . All metal components in direct contact with the ground such as flexible connectors , <br /> swing joints , fittings , clamps , bands , and pumps shall have corrosion protection . <br /> 19 . A " Certification of Installation / Modification " form for each tank shall be submitted by the <br /> owner or the owners ' agent [pursuant to California Code of Regulation ( CCR) 2635 (d ) ] <br /> before this install will be considered complete by EHD . <br /> 20 . An accurate and drawn to scale as- built plan must be submitted to the EHD prior to <br /> scheduling a final inspection . <br /> 21 . No gasoline or other hazardous material or waste can be released ( intentionally or <br /> unintentionally) to the sewer/septic , storm water system , or any other waters of the state . <br /> If a release occurs it will be considered illegal hazardous waste disposal and will be <br /> subject to enforcement . <br /> 22 . Submit the Best Management Practices ( BMP) to EHD for managing fuel spills and <br /> wash - down water at this site prior to the final inspection . <br /> 23 . Submit to CERS correct and complete Monitoring and Response Plans prior to <br /> scheduling a final inspection . <br /> 24 . Submit to CERS . a Certification of Financial Responsibility for Underground . Storage <br /> Tanks containing petroleum form with the appropriate mechanism prior to scheduling a <br /> final inspection , and all other applicable CERS submittal components . <br /> 25 . Passing Enhanced Leak Detection ( ELD) results must be received prior to receiving fuel . <br /> 26 . This permit expires at the end of the next calendar year — December 31 , 2017 . A permit <br /> may be extended if a letter is sent to the EHD requesting this extension thirty days prior <br /> to the expiration date . <br /> Arco AM/PM, 1305 S. Escalon Ave. , Escalon, CA 95209 SR0074800 4 <br />