My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
INSTALL_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 4:32:34 PM
Creation date
11/8/2018 10:25:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2017
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\ESCALON\1329\PR0231487\2017 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time In: <br /> Time Out: <br /> oPcttttN• c San Joaquin County <br /> ). •' ' • d$ <br /> p:: 0�, Environmental Health Department <br /> N: X <br /> 1868 East Hazelton Avenue , Stockton , CA95205-6232 <br /> 4 . . = iP Telephone; (209 ) 468 -3420 Fax; (209 ) 464-0138 Web: www. sjgov . org/ehd <br /> atipoR� <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM PM Date : 09/22/2017 <br /> Address : 1329 ESCALON AVE , ESCALON 95320 <br /> Requestor : PAUL RAJ , CHADHA CONSTRUCTION Telephone: ( 209 ) 595 -0787 <br /> Program Element : 2303 - UST/PIPING INSTALLATION Request # : SR0074800 <br /> Inspection Type: 131 - UST INSTALLATION INSPECTION <br /> Onsite Service Technician: Engel Molina ( instsaller) ICC Service TecWlnstaller Exp , Date : 02/08/2017 <br /> Manufacturer training : <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the following inspection : <br /> Overfill prevention verification . Observed the measurement of the upper tube lengths and verified that the measurement would <br /> meet 95 % tank volume shutoff . <br /> 20 , 000 gallon tank measurements (for both fill tubes) <br /> riser-78" <br /> upper tube length - 89" <br /> 10 , 000 gallon tank measurements <br /> riser-745 ' <br /> upper tube length - 82" <br /> Note : The measurements observed for all three fill tubes provide an overfill percentage that is more stringent than 95 % . <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code. If a reinspection is required , fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Engel Molina , Installer <br /> EH Specialist : JOHN ALANIZ Phone : ( 209 ) 468-3147 <br /> FA0000293 SR0074800 SC131 09/22/2017 <br /> EHD 23-01 Rev. 06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.