Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
VENT S-I'Al DETAIL-S WITH VEEG ER---ROO-F CARBON CANISTER VAPOR POL]SHER ALE: 1" l --O" <br /> WAIJ-) <br /> Cl <br /> 10 1/210 1- <br /> A B PRESSURE VACUUM VENT ,2" <br /> 02�3 PRESSURE VACUUM VENT bp <br /> SERVICEABLE VAPOR SENSOR GROUP - CAPS (SEE NOTE BELOW) CAPS (SEE NOTE BEL,OW) Q--- <br /> PRESSURE VACUUM VENT CAP <br /> 2- -FIE BELOW) <br /> SEE NO ------------- <br /> 2 PIN CONNECTOR OF <br /> TO CCVD VALVE <br /> CANISTER SUPPORT BRACKET <br /> AND FASTENE'RS FROM KIT) <br /> VEEDER--ROOT CARBON CANISTER �6�- <br /> VAPOR POLISHER /-"-CANISTER SUPPORT STUDS <br /> CANISTER WEIGHT APPROX. 70 LBS, W/ NUTS (3 EA SIDE) <br /> SEE FOUNDATION DESIGN CRITERIA <br /> BELOW VEEDER­ROOT CARBON CANISTER <br /> VAPOR' POLISHER <br /> -OCTANE <br /> INSTALL ONLY ON Fi 87 . .... <br /> VENT RISER, DO NOT INSTALL ON <br /> 3 -------.- CANIS ER SUPPORT BRACKET CANISTER WEIGHT APPROX, 70 LBS, <br /> AND FASTENERS (FROM KIT) DIESEL, RISER IF EXISTING Y 67) SEE FOUNDATION DESIGN CRITERIA <br /> 1 1`1 VENT RISER, DO NOT INSTALL ON <br /> a=E BELOW <br /> 0Ate_ CANISTER SUPPORT STUDS W/ INSTALL ONLY ON THE 87-OCTANE <br /> NUTS (3 EACH SIDE) EXPLOSION PROOF' J--BOX DIESEL RISER IF EXISTING <br /> MOUNTED TO POST <br /> ARCO <br /> 2" U--BOLTS CORD GRIP (FROM <br /> ITT .. ............ <br /> r-y- <br /> r,-) EP Will OOAErr FR011 i <br /> ry- <br /> 00 <br /> MANUFACTURER SUPPLIED <br /> VENT PIPE EXTENSION <br /> MOUNTING TUBING <br /> GROUP <br /> INSTALLIN CANISTER ONTO BRACKET 0 <br /> G <br /> Lu 2, 0 1 1 2� 0 <br /> X Ld -i IF <br /> ui > LIJ M `­l"-..--,qEXPLOSION PROOF J-BOX <br /> 0 rn <br /> -J MOUNTED TO POST' V <br /> 0 w <br /> II <br /> V) .Z cr 0 <br /> Lm <br /> < 0 w Z 1 l \\ <br /> MANUFACTURER SUPPLIED <br /> C77= – a: i CL <br /> W 2" REDUCING TEE cr 0 M < LIJ MOUNTING TUBING <> <br /> - I— <br /> cn Q <br /> w 0 0 <br /> CANISTER OPERABILITY TEST PORI' 2� Lyj L>dCep <br /> Ld :z d� 0 <br /> 2" SEH. 40 GALV. STEEL V) 0 __j 0 <br /> LAJ <br /> < �,j 0 V) > <br /> *MAINTAIN CLEARANCE INA VENT RISER PAINT TO U CD __j <br /> DIRECT LINE, TO ALLOW FOR 0K CO <br /> ut­­ < dl< <br /> ESTING MATCH SITE CONDITIONS ........ > bi <br /> CONNECTION Ol I a: <br /> < <br /> APPARA FUS. LL- (3 <1- <br /> CD LJ z <br /> Lu Lid �AV­­ 7 E I G <br /> LJJ L 7- <br /> 3--WAY LOCKING BALL VALVE ---- LAJ 0 7-) (-) '1E Ld <br /> c�< . V) 2" SCH. 40 GALV, STEEL, <br /> -OCKED IN OPEN Ld (y --5 V) <br /> TO BE 1 2" BRONZE U :r- ui Ld efi VENT RISER PAINT TO <br /> FASTEN VENT RISER TO FRAME W/ <br /> POSITION IN NORMAL OPERATING z -BOLT, 3/8"0 HOLE 18215 72ND AVENUE SOUTH <br /> Z <br /> ZD -M 0 MATCH SITE CONDITIONS KENT, WA 98032 <br /> W/ LOCK WASHER HEX NUT. TEST <br /> E <br /> MODE. EACH RISER FOR ELECTRICAL .10- (425)251-6222 <br /> X 0 FASTEN VENT RISER TO FRAME W/ <br /> CONTINUITY TO VENT RACK (TYP.) < <br /> z F-- <br /> 7- o 0 425)251-8782 FAX <br /> BRANCH CONNECTION FROM 00 m 2 BRONZE U--BoLr, 3/8"0 HOLE <br /> C) 0 <br /> z Fn <br /> Ld [n 0 W CIVIL ENGINEERING, [AND PLANNING, <br /> VENT RIDER MUST BE INSTALLED LLJ 'loll (10 0 W/ LOCK WASHER HEX NUT, -TEST <br /> LEVEL OR SLOPED BACK "TO THE 0 EACH RISER FOR ELECTRICAL <br /> t- 11,111111 1,- 0 <br /> cn LjJ :c OL M SIJRVEY1NG,, ENVIRONMENTAL SERVICES <br /> TANKS 1-- 2" TEE WITH 1/4" TEST LA- A CONTINUITY TO VENT RACK (JYP,) <br /> 7 z CK 0 CD <br /> 801-TED GROUND CONNECTION TO Na DATE REIASION DESCRIPTOR <br /> PORT' FITTING AND 1/4 <br /> L� <br /> CL Ld PLUG (TYP,) 7 <br /> R VENT RACK <br /> 2" SCH� 40 GALVANIZED STEEL (.0 cn 0 CIL" <br /> w 0 ....... ZE 02/25/16 Fim RL moTs <br /> RISER, PAINT PER SPECS 2-IN-1 SENSOR&-- 801-FED GROUND CONNECTION TO-- TEE WITH 1/4" TEST <br /> < w <br /> > 0:1 BOX VENT RACK PORT FITTING AND 1/4" 10/4/16 AG ENCY/OWNE R REVS <br /> 2" TEE WITH 1/4" TEST PORT------- PLUG <br /> M #4 BARE STRANDED CU- 10/27/16 AGENCY RLQ <br /> FITTING AND 114-1" PLUG (TYP,) < A EXPLOSION PROOF J--BOX L <br /> GROUND WIRE TO TANK <br /> Lu L MOUNTED -TO POST' 1 "' 2-IN--1 SENSOR <br /> A- FIELD GROUND ROD /2 <br /> ...... Ai BOX <br /> /2 VA OPENINGS WATERTIGHT <br /> 1/4" BALL VALVE AND VACUUM <br /> 1/4" BALL, VALVE AND cul 19 EXPLOSION PROOF' J-BOX <br /> TUBING TO TEST CONTINUITY-----�,, COMPRESSION PASS THRU (TYP,) <br /> TUBING FOR 'TEST 1/4" BALL VALVE AND VACUUM <br /> (-\­- I < \" TUBING TO T�ST COTINUITY­ MOUNTED TO POST <br /> EXPLOSION PROOF' SEAL OFF <br /> ­­ B 9) <br /> J-BOX MOUNTED TO TO TEST CONTINUITY)AL A-Z <br /> ................. <br /> 2-IN-1 SENSOR 191 SEAL OFF <br /> BOX POST INSTALL (1) 1" CONDUIT -- -,,----MANOMETER HOUSING I ' " 0 Z/�\ <br /> 8' (RESERVOIR 'TO TEST' <br /> W/ PULL ROPE FOR <br /> MAN 0 M EFE R INSTALL (1) 1" <br /> SEA[- OFF FUTLJRE TANK DIAGNOSTIC CONTINUITY -C8 CONDUIT W/ PULL ---------............. <br /> REQUIREMENTS ROUTE 'TO <br /> HOUSING --(19) <br /> MONITORING PANEL ­--�I�HYDROSTATIC MONITOR SENSOR -A� - 0 <br /> HYDROSTATIC MONITOR SENSOR mm,. 01 A <br /> 1) F FUN LAJUl WALL VENT ROPE FOR FUTURE ----------------- <br /> FOR DOUBLE WALL VENT TANK DIAGNOSTIC <br /> OPTIONAL 6" THICK BUILDING 0 <br /> I TRANSITION CONTAINMENT SUMP REQUIREMENTS ROUTE <br /> OPTIONAL 6" THICK TO MONITORING PANEL <br /> CONCRETE SLAB <br /> TRANSITION CONTAINMENT SUMP --m-w �­­ <br /> GRADE GRADE CONCRETE SLAB TYPICAL SPILL ZX <br /> -------- 1777 -77' IN BUILDING <br /> BUCKET AT SEAL: <br /> Ill GRADE <br /> 2" BELLxMAi ADAPTER 4�� <br /> 77 <br /> HIGHEST FT- --- (Cr <br /> \M/ ION LEVEL <br /> i �4 <br /> I yll 11 1 1 () <br /> A <br /> -- ------- ...... <br /> 3" FRP BONDED F <br /> x// < <br /> II I: c <br /> m/ -- ---- -------- <br /> 4 <br /> N�/\\\ , <br /> X <br /> W1 TEST PORT GRADE <br /> 6" WIDE DETECTABLE <br /> x <br /> UNDERGROUND MARKING TAPE <br /> /Z�/ , <\ <br /> +;\`\,,';\rf�,,,�\\,� �J` .. " <br /> ""---RACK FOUNDATION TO <br /> BURIED 6"--12" BELOW FINISHED 0 <br /> \< <br /> GRADE: EMPIRE #31---143rs <br /> j BE ENCASED IN 2,500 INSTALL (2) 1" TO A I 'A 1 � 4 I— - - <br /> N Z� X/ UF1 IUNAL 6" THICK <br /> W 110 Ili - <br /> PSI CONCRETE MONITORING PANEL > --- \1 \� INSTALL (2) 1 TO <br /> 2" INSIDE 3" IIICONCRETE SLAB 4 MONITORING PANEL IN C <br /> - CONNECTOR BUILDING <br /> 4 (TYLFL)Ex"DOUBLE WALL- FRP�- ---------- ­­-- ­­ ��­ i BUILDING 4 0CA,LLJj If�-. fff 4VENT' LINE, SEET I_AI <br /> 2" FLEX CONNECTOR 0,4. 1 <br /> I <br /> NOTE BELOW. M, <br /> i _�_ _._ __ _.... - __ __... - ' <br /> LIQUID SENSOR 2" INSIDE 3" DOUBLE WALL (Typ�) <br /> 4 1 l DISCRIMINATING <br /> \1 N, <br /> 11 ` - z//'/\� I I FRP VENT I <br /> 9 -Il SL <br /> xY CONCENTRIC 01S OPE "TO 42 <br /> 9 0 If-,, <br /> ------- 0 A 2 IN',�IDE 3" DOUBLE WALL <br /> 4 BRINE FILLED DOLJBLE(1�)1t,,­ <br /> REDUCER (FYP,) "TANK AT 1/8" PER FOOT 1 ------- <br /> MINIMUM, SEE NOTE BELOW, ii 4 4 BARE STRANDED CU WALL VENT LINE- -­- < FRP VENT- LINE, SLOPE TO <br /> IL---.G i­li 2" FLEX CONNECTOR 9ROUND WIRE TO TANK "TRANSITION SUMP 10 ------ TANK Al- -1/8" PER FOOT <br /> BRINE FILLED DOUBLE I ! <br /> ill i FIELD GROUND ROD <br /> WALL, VENT LINE (Tyl MINIMUM, SEE NOTE BELOW, <br /> < <br /> TRANSITION SUMP 42" <br /> BRINE FILLED DOUBLE <br /> COMPACTED OR NATIVE SOI[.,. --- 4 4 ----------I?r <br /> (TYPICAL) <1 J WALL VENT LINE <br /> TRANSITION SUMP <br /> <1Ot <br /> /X X <br /> r,- ;x <br /> 4, <br /> < x DEW.LOPMENT INFORMAMN: <br /> -Aim— SECTION B-B <br /> .........--------- <br /> OPTIONAL 6" TFIICK-----, <br /> ARCO N <br /> CONCRETE 3000 am/pm <br /> X/ X X/ <br /> SECTION A-A SLAB <br /> X/ <br /> FUEL CANOPY <br /> ---VENT PIPING MOUNTING RACK 12"0 2500 PSI CONCRETE <br /> IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY WITHIN THE RIGID FRP PIPING SYSTEM, PROVIDE AT <1 ...... FOUNDATION w/ 6 MPD's <br /> LEAST 4 FEET OF STRAIGHT PIPE RUN BEFORE A CHANGE IN DIRECTION OF 30 DEGREES OR MORE, <br /> SECTION C-C SEE DETAIL. "A".-I..""'l ............ <br /> (NEPA 30A (2012) §5�3,3(2)), CFC (2010 §3403.69.1) <br /> -THE VENT CONFIGURATION SHOWN IS IN ACCORDANCE WITH CP--201 THE NUMBER OF' VENT CAPS AT EXPLOSION PROOF' ill-BOX <br /> L <br /> VAPOR SENSOR ANY GDF SHALL NOT PERMIT- AN ADDITIVE LEAK RATE OF' MORE T-AN .17 CHF AT 2" OF WATER TO <br /> POST 18)9- <br /> MOUNTED <br /> OPERABILITY COLUMN, MAX ALLOWED WITHOUT MANIFOL,DING IS (3). ESCALON AVENUE <br /> TEST PORT LIQUID SENSORC07 .... ..... <br /> INTRINSICALLY SAFE------ - <br /> NUN--DISCRIMINATING <br /> 77-�' <br /> 1 1 <br /> I DISCRIMINATING X ', V "1 4— <br /> THE VENT DISCHARGE SHALL BE LOCATED SO THAT VAPORS ARE RELEASED AT A SAFE POINT OUTSIDE 77 HK)HWAY 120 <br /> OF BUILDINGS AND NOT LESS TI IAN 3�6 m (12 FT) ABOVE THE ADJACENT- GROUND LEVEL, VAPORS <br /> VALVE ASSEMBLY E9CALC%CA <br /> MINI HYDROSTATIC <br /> I> <br /> GROUP SHALL BE DISCHARGED UPWARD OR HORIZONTALLY AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL x11/ -FOR SENSOR IN <br /> MONI <br /> X X, Y/ <br /> BE LOCATED SO THAT VAPORS WILL NOT BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL 2" BELLxMALE ADAPTER HOl <br /> BE AT LEAST- 1.5 M (5 FT ) FROM BUILDING OPENINGS, VENTS SHALL BE INSTALLED IN ACCORDANCE T­ <br /> TEST PORT ACTIVATED WITH (NEPA 30 (2012) §53.2), (l (2000) §7902,13). (IFC/CFC (2010) §3404,2,7,13)� > FACILITY # TBD <br /> x <br /> BRINE FILLED DOUBLE <br /> VALVE CARBON BED <br /> AWANCE Z&M <br /> LL1L <br /> VENT RISERS SHOULD STAND NO LESS THAN 3' FROM clursIDE EDGE OF CURB t - ­ = 1, 11 TRANSITION SUMP ------- <br /> SERVICEABLE M 3" FRP BONDED FITTING I ­X� -X Di WALL VENT LINE RESIGNED <br /> W/ -TEST PORT (TYP,)C- 7—­ CHEM ft� BP Ri <br /> VAPOR SENSORav <br /> THE ACTUAL NUMBER OF VENT RISERS IS DETERMINED BY THE NUMBER OF UNDERGROUND ...... <br /> DRAWN BY: AUJANCE M <br /> m; \ \� STORAGE TANKS. -THE DIESEL VENT RISER (IF INSTALLED) IS ALWAYS SEPARATE, <br /> 4"x3" CONCENTRIC <br /> REDUCER 039 Vi V-12D PROJFCTNO: <br /> SERVICEABLE-­­­—­ 2" INSIDE 3" DOUBLE 2 2 12/14/2015 17223 <br /> D gn RLTE —C & <br /> PER �201 <br /> 4 ...... ........ <br /> FILTER ELEMENT WALL FRP VENT LINES - CRAWNG TlTLE <br /> 48 <br /> -SEISMIC LOADS (VACUUM MONITORED) NEW VENT STACK <br /> NOTE: INSTALLATION DETAILS W/ VEEDER-ROOT <br /> SITE INFORMATION IMPORTANCE: 1 SITE CLASS D VEEDER ROOT CARBON CANISTER VAPOR CARBON CANISTER VAPOR OR POLISHER' <br /> NOTE: POLISHER TO BE LOCATED IN (CALIFORMA ONLY) <br /> BASIC RESISTING ALI, I <br /> MAINTAIN A 5 FOOT CLEARANCE TO z- <br /> SYSTEMLLJ =- bj 'ARB <br /> GRADE AROUND CARBON CANISTER > -J INSTALLATION MANUAL, LATEST C <br /> AS:>CIE 7 1 Cd=2.5 > CONFORMANCE WFFH MANUFACTURERS <br /> R=2 0=2 <br /> C.- (REF: SD1 :=1.0 SD 1,83 <br /> CANISTER--," EXECUTIVE ORDER VR-204 AND ALL <br /> TABLE 1 5�4:::��) VAPOR POLISHER FOOTPRINT <br /> APPLICABLE STATE AND LOCAL CODES. <br /> [EST PORT (BASE SHEAR EQ, (MAX, BASE SHEAR (MIN. BASE SHEAR <br /> C== <br /> DESIGN BASE 12,8--2) EQ. 12.8­2) EQ. 12,8---5&6 <br /> DETAIL 'A' SHEAR: 0,92W V=Csw V=SD1W TR/1 V= 5SVI <br /> SECTION D-D <br /> V=0.92W V=1. 5W �=O�2EW <br /> SCALE: NONE G , 0m6,,2 <br /> SCALE: NONE P.LAN-I.YIEW <br />