Laserfiche WebLink
i <br /> CIJENT <br /> bp <br /> A "A '7% <br /> VEEDER ROOT CARBON CANISTER VAPOR POLISHER <br /> A :..` <br /> COMPLIANCE AND INSTALLATION NOTES <br /> THESE NOTES ARE. APPLICABLE TO NEW AND RETROFIT INSTALLATIONS <br /> ADDITIONAL IN.STAL_QATIO)N.._NOTE : <br /> LOCATION _Q€ _ POR, F�rCC----NC- ,E(�QL -ENT,,,CAFIR ODES - ADD9T(QNAI IN�TAI....LATION NOTES AT DISPENSERS: <br /> CFC 2010 §2206,7,9,2,2 LOCATION 1. ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER 1, SOME DISPENSER NOZZLES HOLSTERS ARE: NOT COMPATIBLE WITH TIME Ao kL <br /> INSTALLATIONS SHALL BE REVIEWED BY BP LOGISTICS FOR APPROVAL CURRENT. VST DESIGN. CONSULT WITH BP NOT <br /> MANAGER FOR A LIST <br /> EQUIPMENT VAPOR—PROCESSINGEQUIPMENT SHALL. BE LOCATED AT OR ABOVE PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND OF DISPENSERS THAT ARE NOT COMPATIBLE WITH THE DESIGN AND DO NOT <br /> GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT LESS 'THAN 50 FEET RE---REVIEWED BY ESP LOGISTICS AF­FER PERMIT APPROVALS ARE OBTAINED, INSTALL VST AT LOCATIONS WHERE THESE DISPENSERS EXIST. 14 pr <br /> ADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS <br /> (15240MM) FROM FUEL.-..TRANSFER AREAS AND NOT LESS THAN 18 INCHES TO MAKE SURE THERE ARE NO SENSITIVE: RECEPTORS WITHIN 1000 FEET <br /> (457.2MM) ABOVE TANK FILL: OPENINGS AND TOPS OF DISPENSER ISLANDS, OF THE EQUIPMENT L.00ATTON, 2, THE PRESSURE SENSOR LOCATED IN THE DISPENSER SUMP CLOSEST TO <br /> THE TANK FARM SHALL. BE PREFERABLY MOUNTED OUTSIDE THE DISPENSERARCO <br /> VAPOR-PROCESSING UNITS SHALL.. BE LOCATED NOT LESS THAN 10 FEET 2. ON EXISTING FACILITIES CONTRACTOR TO PERFORM LIQUID AND VAPOR CONTAINMENT SUMP OR ABOVE THE HIGHEST PENETRATION FITTING, DURING <br /> (3048MM) FROM THE NEAREST BUILDING:, OR PROPERTY (_INE: OF A PROPERTY TIGHTNESS TEST ON VENT LINES PRIOR 'TO PROCEEDING WITH INSTALLATION CONTAINMENT SUMP CERTIFICATION TESTING PRESSURE SWITCH TO AVOID POSSIBLE WATER DAMAGE,CONTRACTOR, TO REMOVE TIES <br /> N <br /> N LLC <br /> WHICH CAN BE BUILT UPON, OF THE VEEDER ROOT SYSTEM, REPORT TO BP PRODUCT MANAGER WITH <br /> EXCEPTION: WHERE THE REQUIRED (.DISTANCES TO BUILDINGS, PROPERTY RESULTS. 3, THE PRESSURE SENSOR MUST' BE INSTALLED IN THE VERTICAL POSITION, <br /> LINES OR FUEL-TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL BE <br /> PROVIDED -TO PROTECT EQUIPMENT' AGAINST FIRE EXPOSURE, ACCEPTABLE 1 THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED O THAT VAPORS SENSING FORT POINTING DOWN, AND WHEN REQUIRED BY AUTHORITY (LAVING <br /> MEANS INCLUDE.: � JURISDICTION, THE CONNECTION TO THE VAPOR LINE MUST BE BELOW THE <br /> � <br /> 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT L_F�A 18 WILL DISPERSE. VAPORS SHALL. BE DIRECTED UPWARD AND HORIZONTALLYAWAY FROM ADJACENT WALLS, VENT OUTLETS SHALL_ BE LOCATED SO AS ;HEAR VALVE <br /> INCHES (457,2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF FIRE---RESISTANT NOT TO BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALE_ BE 4, THE .S-WAY VALVE TEST PORT ON THE PRESSURE SENSOR IN TETE <br /> OR NON.--COMBUSTIBLE MATERIALS OR AT LEAST 5 FEET FROM BUILDING OPENINGS, DISCHARGE SHALL NOT BE <br /> 2, FIRE PROTECTION USING AN Af='DROVED WATER-SPRAY SYSTEM, LESS THAN 12' FROM FINISH GRADE, VENTS SHALL BE INSTALLED IN DISPENSER CLOSEST TO THE TANK FARM SHALL BE "CAR SEALED" WITH <br /> ACCORDANCE WITH NEPA 30 (2012). <br /> LABELS INDICATING CORRECT OPERATING POSITION. VALVE TO REMAIN ,. <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE: LOCATED A MINIMUM OF 20 FEET CLOSED FOR NORMAL, OPERATION TO AVOID FALSE PRESSURE READING BY <br /> 6096MM FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE THE ISD SOFTWARE.( ) 4. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF <br /> PROTECTED AGAINST PHYSICAL DAMAGE: BY GUARDRAILS, CURBS, PROTECTIVE CUE�(3, <br /> ENCLOSURES OR FENCING, WHEN APPROVED PROTECTIE ENCLOSURES ARE �. TETE. DISPENSERS MUST BE A BALANCE TYPE LDISPEmNSER, sCo <br /> USED, APPROVED MEANS SHALL BE PROVIDED -TO VENTILATE THE VOLUME 5. THE. CONTRACTOR IS RESPONSIBLE FOR SHOEING AND THE PROTECTION IN � - 'TYPES � <br /> WITHIN THE ENCLOSURE TO PREVENT POCKETING OF' FLAMMABLE VAPORS, 6. THE DISPENSER. MUST BE GARB APPROVED UNIEIOSE_ TYF ES UNL._ESS N <br /> PLACE OF EXISTING FACILITIES. PERMITTED BY AUTHORITY HAVING JURISDICTION. <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR-PROCESSING 6, MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER 7. THERE SHALL_ BE NO FLOW LIMITERS ALLOWED FOR THE VST SYSTEM, <br /> UNIT FROM A FUEL---TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE FOOTPRINT' TO GRADE.. 18215 ?2ND AVENUE SOUTH <br /> ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT, KENT, WA 98032 <br /> 8. FOLLOW PEI RP--400 FOR ELECTRICAL CONTINUI�T1'° OF HANGING HARDWARE <br /> 7. BALL FLOAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD (425)251-6222 <br /> CFC 2010 2063.9.2,3 INSTALLATION PRACTICE FOR PROTECTION OF WETTING OF THE: VENT AND STAGE II VAPOR (425)251--8782 FAX <br /> 9. HARDWARE HAS THE OPTION OF LONGER FOS_ LENGTHS. <br /> VAPOR—PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE, PIPING. CONTRACTOR TO CONFIRM THE EXISTING INSTALLATION AND MAXIMUM HOSE LENGTH _ O 15�--0"" CONSULT <br /> f T N <br /> WHEN CONNECTED IS LIMITED I CIVIL ENGINEERING, LAND PLANNING, <br /> MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER REPLACE ALL BALL. FLOAT VALVES AT EXISTING FACIL_II-IES, WITH DISPENSER MANUFACTURER FOR EXTENDED NOSE, REACH DESIGN � ENVIRONMENTAL �ERv�cE� <br /> NON--COMBUSTIBLE FOUNDATIONS. OPTION. uYING, EN <br /> 8, CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT -��---- <br /> NOTE: BP DOES NOT_PERM_IT: THE-,_VAPOR PRO ESSINC_FQIJIF?MENI._Tt.,,,-__BE PRODUCT" VENT TIE: IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER NO. DATE R MSION DESCRIPTION <br /> IN STAAI LED ON ROO-FS_._OF ,BUILDINGS_ OR CANOPY_STRUCTURES, SEE_.ALTEFRNATPROCESSOR TIEM-IN. F'F�OVIDE. CONFIRMATION ON PIPE AND TANK CFIECKLIST TESTING._..NOTES: 02/25/16� W�y�" <br /> MOUNTING CDETAIL.S, FOR-EXISTING SITES WHERE VE:NTRI RISERS AR v MOUNTED AT �"� COMM <br /> -_ -- (LABEL. MAKER OK). "DOD NO INSTALL ON DIESEL" ,� <br /> E(DCJFSmm PER GARB E,O, VR--204 ALL EXISTING SINGLE WALL. VENT AND VAPOR PIPING L ` 10/4/16 AGENCY/OWNER RM <br /> ,,,. <br /> 9. THERE SHALL_ BE; NO POCKETS OR LIQUID TRAPS IN ANY OF THE INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL <br /> .. <br /> XI LIINt�_ .N„ ITIO 5� CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER 10/27/96 AGENCY R <br /> THE CONTRACTOR SHALT... BE RESPONSIBLE FOR DETERMINING THE EXISTING POLISHER TO 'THE VENT STACK TIF--IN POINT, START--IUP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE <br /> CONTROLLING SIDE CONDITIONS AND FOR COMPLIANCE WITH LOCAL ORDINANCES FOLLOWING TEST PROCEDURES. __ __ <br /> AND CURRENT CALIFORNIA BUILDING CODES, 10. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED, TIE THF <br /> GROUND WIRE FROM 'THF VENT STACKS TO THE UST SYSTEM GROUND, - DETERMINATION <br /> APPLICABLE LE_ ODES: _ PERFOF�MANCE OF VAE'OR RFECOVERY SYSTEMS OF DE PIN TNG FACILITIES <br /> ALE_ WORK Sf-LALI_ BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF 11. PRIOR TO PERFORMING MAINTENANCE, �rE:S-T PORT VALVE MUST- BE VENTED (March 17, 1999); � <br /> THE CALIFORNIA BUILDING CODE AND REFERENCED STANDARDS, TO R "TO ATMOSPHERE. <br /> TP---201,4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE _ <br /> PLANS AND PERMITS: 12. VEEDER ROOT SYSTEM TO BE LEAK--TESTED PRIOR TO START-UP TO AVOID WITH THE CONDITION LISTED IN ITEM 1 OF' THE VAPOR COLLECTION <br /> THE CONTRACTOR SHALL. OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND - _7 <br /> LEAKAGE TO ATMOSPHERE. SECTION OF EXHIBIT 2 OF THE VR_204 EXECUTIVE ORDER; IN ADDITION <br /> SHALL POSSESS APPROVED PLANS PRIOR TO BEGINNING OF CONSTRUCTION, BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 <br /> 13, ANY SPENT CARBON FROM CANISTER SHALL BE -TREATED AS HAZARDOUS <br /> UMI-.TTY LOCATIONS: AND DISPOSED OF PROPERLY EXHIBIT 4 OF THE VR--20.14 EXECUTIVE ORDER, REQUIRED ITEMS IN <br /> -- <br /> THE CONTRACTOR WILL BE: REQUIRED TO NOTIFY MEMBERS OF' UNDERGROUND CONDUCTING TP-201.3; �w� <br /> SERVICE ALTER (U,S,A.) 48 FIOURS IN ADVANCE OF PERFORMING EXCAVATION 14. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR SEAL, mm _ <br /> WORK BY CALLING THE TOLL--FREE NUMBER (800)-22.7--2600. EXCAVATION DAMAGE PRIOR -FO START UP OR RE-COMMISIONING AFTER SERVICE:. PEXHIBIT 5 ROCEDURE;F THE VR--204 EXECUTIVE ORDER, LIQUID REMOVAL TEST rf �­111- <br /> pgESS� �fl t ,�lE <br /> FOR THE PURPOSE OF THIS REQUIREMENT, IS DEFINED AS BEING 18' OR 0�__- _____ <br /> 44 <br /> MORE IN DEPTH BELOW THE EXISTING SURFACE, <br /> ELECTRICAL INSTALLATION NOTES:a ~ � <br /> EXHIBIT 6 OF THE VR--204 EXEC LIFIVE ORDER, HYDROCARBON SENSOR' <br /> VERIFICATION TEST; � CHRIS M. TF A <br /> 1. ALL E.LECFRICAL. INSTALLATIONS ARE TO BE PER NEC/CEC CODE FOR THE 1 „E <br /> AREA INSTALLED. INSTALLATION IN A CLASSIFIED AREA IS AN EXCEPTION _., C,8 ` '., <br /> TO TETE NORMAL_ SII ING AND SHALL REQUIRE FURTHER REVIEW OF BP EXHIBIT 8 OF. THE VR-204 EXECUTIVE ORDER, VAPOR �' " ° <br /> PROJECT MANAGER, PRESSURE SENSOR VERIFICATION TEST; <br /> ENSURE THE VEEDER ROOT' CARBON CANISTER VAPOR POLISHER IS EXHIBIT 9 OF THE VR-204 EXECUTIVE ORDER, DETERMINATION OF VST <br /> PROCESSOR ACTIVATION PRESSL..IRE; \ >� p V <br /> BONDED AND GROUNDED -IO THE SITE SYSTEM AND TO THE SITE TANK <br /> GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL TEST <br /> DISCHARGE AS AN IGNITION SOURCE, AND EXHIBIT 11 OF THE VR-204 EXECUTIVE ORDER, OPERABILITY TEST -PROCEDURE FOR FOR THE VEEDER--ROOT ISD FLOW METER. <br /> 1 BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL <br /> CONSTRUCTION REGARDING DISPENSING EQUIPMENT ARE TO BE IN PLACE DISTRICT' REQUIREMENTS, NOTIFICATION OF, TESTING, AND SUBMITTAL, OF TEST <br /> AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE: (PEI), RESULTS, SHALL_ BE DONE IN ACCORDANCE WITH LOCAL DISTRICT <br /> REQUIREMENTS AND PURSUANT TO POLICIES ESTABLISHED BY THAM DISTRICT, <br /> ALTERNXT{VE TEST PROCEDURES, INCI.-UDING MOST RECENT VERSIONS OF THE <br /> TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB <br /> EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING„ TO YIELD <br /> EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING <br /> REQUIREMENTS ARE MADE:. A CONDITION OF CERTIFICATION. THE OWNER OR <br /> OPERATOR OF THE VST PHASE II EVR SYSTEM INCLUDING VEEDER-ROOT ISD DEVEE.Drn�rlN6f7R�fAl1aN: <br /> SHALL_ CONDUCT, AND PASS„ THE FOLLOWING TESTS NO LAMER THAN 60 DAYS <br /> AFTER STARTUP USING THE. FOLLOWING TEST PROCEDURE.. EXHIBIT 10, NOZZLE ARCO N11 <br /> BAG TEST PROCEDURE, NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST ___ --- 11111111 <br /> RESULTS, SHALL BE DONE IN ACCORDANCEWITH LOCAL DISTRICT 3000 am/pm <br /> REQUIREMENTS AND PURSUANT TO THE POLICIES ESTABLISHED BY THAT <br /> DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS FUEL CANOPY <br /> OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY w <br /> THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, <br /> TO YIELD EQUIVALENT <br /> RESULTS. <br /> s17 ADDRESS: <br /> ESCALON AVENUE <br /> o A <br /> BCALOR OA <br /> FACILITY <br /> DESIGNED DY ALLIANCE Z&DFS; <br /> CHH BY: BP REPIA: <br /> av <br /> DRAWN BY AUJANCE: RM <br /> VERSION: V-12-0_ ESR CT NCS. <br /> 4 7223 <br /> 12/14/2015 <br /> DRAWNG nTEF _ <br /> VFOFm00T <br /> CARSON CANISTER VAPOR POLISHER <br /> COMPLIANCE AND INSTALLATION NOTES <br /> (CALIFORNIA ONLY) <br /> � Er��Vi <br />