My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\14000\PR0231631\COMPLIANCE INFO 2016- PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016- PRESENT
QuestysRecordDate
5/18/2017 8:47:48 PM
QuestysRecordID
3387540
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web.,www.siaov.orD/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Colonial Energy CE 40138 (Formerly Tower Mart 1 14000 E HVVY 88 , Lockeford Aril 12 2016 <br /> UST System Observations <br /> 321 CCR 2636(c)(1) All releases in secondary piping do not flow to a collection sump ❑V ❑R a COS <br /> 322 CCR 2636(f)(2) Line leak detector not installed ❑V ❑R ❑COS <br /> 323 CCR 2636(f)(2) Leak detector failed to detect a 3.0 gph leak at 10 psi o V ❑R ❑COS <br /> 324 CCR 2635(b) No spill bucket installed or failed to provide a means to keep it empty ❑V ❑R ❑COS <br /> 325 CCR 2635(b) Spill container failed to contain a minimum capacity of five gallons .V ❑R a COS <br /> 326 CCR 2635(b)(2) Overfill prevention system not present or failed to meet overfill requirements ❑V ❑R ❑COS <br /> 327 CCR 2635(b)(2) Overfill prevention was overridden ❑V ❑R ❑COS <br /> 328 HSC 25283.5 Unburied below grade USTfailed to meet exemption status ❑V o R ❑COS <br /> 329 CCR 2717.1(g) Tampered with red tag n V in R ❑COS <br /> 330 CCR 2717.1(1) Deposited petroleum into a red tagged UST ❑V ❑R ❑COS <br /> 331 HSC 25299(f)(2) Tampered with or disabled leak detection devices or alarms ❑V ❑R ❑COS <br /> 332 CCR 2631.1 USTsystem not compatible with the substance stored ❑V n R ❑COS <br /> 333 HSC 25298(b) Failed to comply with temporary closure requirements ❑V ❑R ❑COS <br /> 334 HSC 25298(c) Failed to comply with permanent closure requirements ❑V ❑R ❑COS <br /> Non-Pressurized Piping <br /> 401 CCR 2636(a)(3) Suction piping not properly sloped or incorrectly located check valve ❑V ❑R ❑COS <br /> 402 CCR 2643(d) Daily monitoring of suction pipe(pre-Jan 1984)not performed ❑V ❑R ❑COS <br /> 403 CCR 2643(d) Triennial 0.1 gph line test for conventional suction piping not performed(pre-January 1984) ❑V n R o COS <br /> 404 CCR 2643(e) Biennial 0.1 gph test for gravity piping not performed(pre-January 1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted Administration/Documentation violation o V o R o COS <br /> 2030 See below Unlisted Operations/Maintenance violation ❑V o R ❑COS <br /> 2060 See below Unlisted Design/Construction violation o V o R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 104 CCR 2711 UST Operating Permit Application for Facility and Tank information not submitted or current. <br /> UST Tank Information forms for the 87, 91, and diesel tanks are not current in CERS. The tank overfill prevention lists <br /> yes for the audible and visual overfill alarm. This facility does not have the external audible and visual alarm for 90% <br /> overfill prevention. This facility has mechanical flappers for 95% overfill prevention. The vent, vapor recovery, and fill pips <br /> piping construction fill component lists yes for containment sump. This should be listed as no. This facility does not <br /> have fill containment sumps. Any change of information must be updated in CERS within 30 days of the changes. <br /> Immediately log into CERS, update the required information, and submit for review by the EHD. <br /> This is a Class II violation. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.