Laserfiche WebLink
Amador Chemical Company -3- 13 May 1986 <br /> i <br /> 3. Runoff from the entire site is collected in the storm water pond. The f <br /> facility' s storage and manufacturing areas should be inspected to ensure <br /> that no conditions exist which would allow any compounds of concern to <br /> enter the storm water pond. <br /> i <br /> i <br /> INSPECTION SUMMARY <br /> Amador Chemical should: <br /> 1. Adopt a Monitoring Program requiring storm water and ground water <br /> monitoring. <br /> 2. Conduct soil sampling and ground water monitoring in the pond area. <br /> 3. Assure pond closure in conformance with Subchapter 15. <br /> RICHARD AZEVED@4 Project Engineer <br /> RGA:jec <br /> Attachment <br />