Laserfiche WebLink
STOKLEY CONSTRUCTION <br />SITE SAFETY PLAN <br />701 East Charter Way, Stockton, California <br />STOKLEY PROJECT Q18 <br />1) INTRODUCTION <br />This Site Safety Plan (SSP) establishes the requirements to <br />adequately protect workers during underground storage tank (UST) <br />removal activities for the property at 701 East Charter Way, <br />Stockton, California. Specific site safety procedures to be <br />utilized for all personnel involved in the protect are explained <br />herein. <br />This plan presents a realistic approach to the anticipated <br />hazards at the site and shall be considered as an appropriate <br />site specific worker protection plan. Site conditions may vary <br />throughout the duration of the protect. As the conditions <br />change, parts of the plan may be updated as required. All <br />changes in health and safety measures specified must be approved <br />by the Site Safety Officer (SSO) . <br />A copy of this SSP will be kept on sitQ at all times and made <br />available to all personnel assigned to this pro,)ect. In addition <br />to this, all information presented in the Site Satety Plan wiii <br />be reviewed with said employees by SSO. <br />Every employee is expected to be familiar with and comply with, <br />all portions of the SSP. Regulatory personnel, visitors and <br />contractors entering the work areas are expected to be familiar <br />with and adhere to all provisions of the SSP. Such personnel will <br />be expected to utilize personal protective equipment which equal <br />to, or exceeds that designated by the SSO. Documentation of <br />medical and training qualifications may be required. Anyone <br />failing to adhere to the requirements of the SSP may be <br />prohibited from entering the active work areas. <br />