My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
REMOVAL 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 8:16:55 AM
Creation date
11/14/2018 4:04:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 Site Safety Officer Responsibilities (continued) <br />Providing a pre -entry briefing according to section 4 of <br />this plan. <br />Inspecting the use of proper personal protective equipment <br />PPE by employees, contractors and subcontractors at all <br />times. <br />Monitoring workers for signs <br />stress. Workers experiencing <br />moved into the cold zone for <br />down. <br />and symptoms of excessive heat <br />excessive heat stress shall be <br />liquid replenishment and cool <br />2.3 Sampling Team Personnel Responsibilities <br />Become familiar with and follow the requirements of this <br />site safety plan and follow instructions given by the SSO. <br />Notify the SSO of any injury. signs of symptoms of <br />overexposure to hazardous substances, any unsafe acts or <br />conditions occurring at the site. <br />Collect samples as instructed using proper equipment and <br />safe procedures to minimize exposure to hazardous materials <br />or conditions. <br />3.0 JOB HAZARD ANALYSIS <br />The field tasks associated with this tank removal are discussed <br />below: <br />Pre -work site visit and verification of UST location. <br />UST excavation preparation, excavation, removal, <br />transportation and disposal. <br />Examination of excavation and collection of soil samples. <br />Back -fill of excavation. <br />The work activities outlined above present potential physical and <br />chemical hazards to the workers involved. In all instances, <br />precautionary measures will be implemented to minimize the risk. <br />It is not expected that any workers or nearby residents shall be <br />adversely affected by the proposed work. Strict environmental <br />monitoring will be conducted at and around the work area. <br />Adherence of this SSP will minimize the risk to persons <br />conducting work and also to those not associated with the field <br />work. This assessment will be revised periodical during the site <br />investigation as more detailed information becomes available. <br />The following chemicals are suspect of being present at the site: <br />total petroleum hydrocarbons as gasoline (TPHg) and the gasoline <br />constituents benzene, toluene, ethylbenzene and total xylenes <br />(BTEX), other gasoline constituents methyl tertiary butyl ether <br />(MTBE) also, total petroleum hydrocarbons as diesel (TPH&g). <br />Care will be taken to minimize dermal contact with waste <br />materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.