Laserfiche WebLink
Table of Contents <br />1 Introduction.............................................................3 <br />2 Listings and approvals............................................3 <br />3 Inspection, handling & storage ..............................3 <br />4 Materials..................................................................4 <br />Pipe...........................................................................4 <br />Fittings.......................................................................4 <br />Adhesive....................................................................4 <br />Tools..........................................................................4 <br />Applying Ameron adhesive.....................................10 <br />5 Field cutting & tapering primary pipe....................5 <br />Cutting.......................................................................5 <br />Removing containment............................................5 <br />Pot life & cure time for Ameron adhesive................10 <br />Tapering with Ameron Taper Maker ..........................5 <br />Tapering with power tapering tools ..........................6 <br />6 Piping system layout...............................................6 <br />Using heat blankets................................................11 <br />Trenching, bedding & backfilling...............................6 <br />Supporting valves, accessories & vent lines <br />.............7 <br />Precise alignment and make-up...............................8 <br />Flexible sump penetration fitting installation <br />.............8 <br />Cross-overs...............................................................9 <br />7 Bonding primary systems.......................................9 <br />2 <br />U <br />Joint preparation.......................................................9 <br />Mixing Ameron adhesive...........................................9 <br />Applying Ameron adhesive.....................................10 <br />Making the joint.......................................................10 <br />Pot life & cure time for Ameron adhesive................10 <br />Force curing Ameron adhesive...............................11 <br />Using heat blankets................................................11 <br />Connecting to non-Ameron fiberglass piping .........11 <br />8 <br />Sealing secondary containment system.............12 <br />Joint preparation.....................................................12 <br />Making the joint.......................................................12 <br />Terminating the secondary containment ................12 <br />Terminating test reducer.........................................12 <br />Molded termination assembly.................................12 <br />9 <br />NPT threaded connections...................................13 <br />Thread preparation..................................................13 <br />Making the joint.......................................................13 <br />Isolating flex connections at the shear valve <br />..........13 <br />10 <br />Repair procedures................................................14 <br />Minor damage.........................................................14 <br />Major damage........................................................14 <br />11 <br />Primary system testing.........................................14 <br />Recommended practices........................................14 <br />12 <br />Containment system testing................................15 <br />Pneumatic testing...................................................15 <br />Provisions for testing and monitoring .....................15 <br />13 <br />Simultaneous testing............................................15 <br />14 <br />Health & safety information..................................16 <br />Toxicity of adhesive................................................16 <br />Handling precautions for adhesive .........................16 <br />First aid for adhesive users....................................16 <br />Important Notice.....................................................16 <br />2 <br />U <br />