My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />1 Introduction.............................................................3 <br />2 Listings and approvals............................................3 <br />3 Inspection, handling & storage ..............................3 <br />4 Materials..................................................................4 <br />Pipe...........................................................................4 <br />Fittings.......................................................................4 <br />Adhesive....................................................................4 <br />Tools..........................................................................4 <br />Applying Ameron adhesive.....................................10 <br />5 Field cutting & tapering primary pipe....................5 <br />Cutting.......................................................................5 <br />Removing containment............................................5 <br />Pot life & cure time for Ameron adhesive................10 <br />Tapering with Ameron Taper Maker ..........................5 <br />Tapering with power tapering tools ..........................6 <br />6 Piping system layout...............................................6 <br />Using heat blankets................................................11 <br />Trenching, bedding & backfilling...............................6 <br />Supporting valves, accessories & vent lines <br />.............7 <br />Precise alignment and make-up...............................8 <br />Flexible sump penetration fitting installation <br />.............8 <br />Cross-overs...............................................................9 <br />7 Bonding primary systems.......................................9 <br />2 <br />U <br />Joint preparation.......................................................9 <br />Mixing Ameron adhesive...........................................9 <br />Applying Ameron adhesive.....................................10 <br />Making the joint.......................................................10 <br />Pot life & cure time for Ameron adhesive................10 <br />Force curing Ameron adhesive...............................11 <br />Using heat blankets................................................11 <br />Connecting to non-Ameron fiberglass piping .........11 <br />8 <br />Sealing secondary containment system.............12 <br />Joint preparation.....................................................12 <br />Making the joint.......................................................12 <br />Terminating the secondary containment ................12 <br />Terminating test reducer.........................................12 <br />Molded termination assembly.................................12 <br />9 <br />NPT threaded connections...................................13 <br />Thread preparation..................................................13 <br />Making the joint.......................................................13 <br />Isolating flex connections at the shear valve <br />..........13 <br />10 <br />Repair procedures................................................14 <br />Minor damage.........................................................14 <br />Major damage........................................................14 <br />11 <br />Primary system testing.........................................14 <br />Recommended practices........................................14 <br />12 <br />Containment system testing................................15 <br />Pneumatic testing...................................................15 <br />Provisions for testing and monitoring .....................15 <br />13 <br />Simultaneous testing............................................15 <br />14 <br />Health & safety information..................................16 <br />Toxicity of adhesive................................................16 <br />Handling precautions for adhesive .........................16 <br />First aid for adhesive users....................................16 <br />Important Notice.....................................................16 <br />2 <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.