My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Introduction Dualoy 3000/LCX primary pipe and fittings are manufactured from thermosetting epoxy <br />resins reinforced with high tensile strength fiberglass filaments. The pipe is produced by <br />filament winding. The pipe incorporates a resin -rich inner liner that is resilient and <br />holiday -free and a resin -rich outer coating that protects the structural wall from UV <br />degradation during storage and installation. The structural wall strength of <br />Dualoy 3000/LCX pipe is unsurpassed in the fiberglass pipe industry. Primary fittings are <br />manufactured by filament -winding or compression molding. <br />Dualoy 3000/LCX pipe and fittings are electrically non-conductive and never require <br />cathodic protection or sacrificial anodes. Installed systems are immune to external <br />corrosion from stray -current electrolysis and cathodic interference. They are unaffected <br />by alkaline or acidic soil conditions. <br />The primary pipe and fittings are joined using the same strong, reliable bonded joint as in <br />Dualoy 3000/L single wall piping. <br />The primary and containment piping systems are completely separated, making this a <br />true coaxial system. The space between the primary and containment pipe is controlled <br />by an even layer of graded sand. Precise dimensions are maintained as is a free-flowing <br />interstitial space. <br />The containment connection between the pipe and fittings is made by a fast, effective <br />mechanical seal with elastomeric gaskets. <br />Dualoy 3000/L single-wall piping systems <br />Detailed installation instructions for Dualoy 3000/L single-wall piping may be found in <br />Ameron Bulletin 7501 (FP104) available from Ameron Fiberglass Pipe Group or your <br />Ameron distributor. <br />2 Listings and <br />approvals <br />U Lp Underwriters <br />laboratories Inc.® <br />Dualoy 3000/LCX is Listed in the United States with Underwriters Laboratories for <br />nonmetallic underground piping for petroleum products, alcohols and alcohol -gasoline <br />mixtures (File MH9162). Dualoy 3000/LCX pipe & fittings are also listed with Underwriters <br />Laboratories of Canada for Petroleum Products and Oxygenated Fuels (File CMH715). <br />3 Inspection, handling <br />Inspection <br />and storage <br />Careful inspection of the outer (secondary) layer of pipe is especially important on coaxial <br />containment installations. Since damage to the primary is not visible once the pipe is <br />installed, it is essential to check the outer pipe jacket for damage. Testing has shown that no <br />damage will occur to the primary pipe without an indication of damage on the outer jacket. <br />Upon receipt at the job site, inspect the pipe fully. Locate, cut out, repair or replace <br />damaged pipe. Impact damage is usually recognizable as rounded pale areas just under <br />the surface or as deep gouges, scratches or cracks. Remove end protectors to inspect <br />tapers for damage and then replace protectors. Inspect grooves and threads on fitting <br />assemblies for damage. If threads are badly damaged or grooves are affected, discard <br />and replace with a new part. <br />Handling <br />Dualoy 3000/LCX has the higher impact resistance than single-wall pipe, however, <br />fiberglass pipe is susceptible to damage if handled improperly. Adhere to the following <br />recommendations when handling: <br />• Do not transport pipe without proper protection against impact. <br />• Truck pipe racks should be padded with carpeting or like material to prevent damage. <br />• Tie the pipe down during transport to prevent it from bouncing on the racks. <br />• Do not use chains to tie down the pipe on a truck: Use nylon straps or hemp rope. <br />• Do not drop the pipe from truck bed when stringing: Lay the pipe down by hand. <br />• Pipe loads that are properly separated and supported can be unloaded by padded forklifts. <br />Storage <br />Dualoy 3000/LCX pipe incorporates a 5 -mil thick, resin -rich reinforced outer coating <br />which provides outstanding UV resistance. Pipe stored out-of-doors for extended <br />periods may assume a chalky appearance. However, this change in appearance is <br />superficial and does not affect the pipe's performance. Protect stored pipe from <br />impact damage by stacking on padded racks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.