Laserfiche WebLink
S WRCB, January 2002 <br />Method Developed By: <br />6. PIPING SUMP TESTING <br />❑ Sump Manufacturer <br />❑ Other (Spec) <br />❑ Industry Standard <br />Page q ofa <br />Professional Engineer <br />Test Method Used: ❑ Pressure ❑ Vacuum ydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: C4lr ie!/ LtutG 4-A— -T Equipment Resolution: 0z9S' <br />Sump # Sump # Z_ ump # ump # <br />Sump Diameter: 42 V <br />Sump Depth: <br />1 `' <br />3 �� <br />Sump Material: <br />rJ u'ltee 5-5 <br />Height from Tank Top to Top of <br />t <br />Highest Piping Penetration: <br />+? <br />S ` <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />"l <br />y <br />Portion of Sump Tested <br />GJ4 /�.—Le�t,C el a <br />ctJk-rL �r,� l� ci <br />Does turbine shut down when <br />sump sensor detects liquid (bothYes <br />❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Nes <br />❑ Yes 11N ❑ NA <br />Elfo ❑ NA <br />product and water)?' <br />Turbine shutdown response time <br />J64- 64,ec� <br />IuP 4 ckc., <br />Is system programmed for fail-safe <br />shutdown? <br />es ❑ No ❑ NA <br />,� " <br />es ❑ No [INA <br />❑04oEl Yes NA <br />Yes No ❑ NA <br />Was fail-safe verified to be <br />,ep—W M eel <br />Gf»M , s <br />operational?* <br />❑ Yes >eNo ❑ NA <br />❑ Yes o ❑ NA <br />❑ Yes No ❑ NA <br />❑ Y ❑ No ❑ NA <br />Wait time betwep4ppizing <br />pressure/vacuurkwater d starting <br />test: <br />/6/ylrnuG �S <br />Test Start Time: <br />• Z <br />: w <br />Initial Reading (RD: <br />Test End Time: <br />0:55 <br />Final Reading (RF):r)d <br />Test Duration:Change <br />itReading (RF-Ri):Pass/Fail <br />Threshold or Criteria: <br />Test Result <br />)OPass D Fail <br />ass ❑ Fail <br />Pass. Fail <br />❑ Russ Fail <br />Was sensor removed for testing?es <br />❑ No ❑ NA <br />es ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />fYes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No NA <br />� ❑ Yes ❑ No NA <br />` <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />