My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB, January 2002 Page 's of <br />7. UNDER -DISPENSER CONTAINMENT C TESTING <br />Comments — (include information on re airs made rior to testin , and recommended follow -u for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />thod Developed By: <br />❑ UDC Manufacturer ❑ Industry Standard rofessional Engineer <br />❑ Other (Specify) <br />thod Used: <br />LTest <br />❑ Pressure <br />❑ Vacuum <br />"ydrostatic <br />❑ Other (Spec) <br />ipment Used: Ce( /,rev ILev-e J;4,—jt e_,e JK <br />Equipment Resolution: <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Hi est Piping Penetration: <br />UDc #1 L Z <br />/�(�„ <br />O L <br />unc # 3 <br />/ <br />_ �, <br />UDC #s rn� <br />unc # 7. 3" <br />t <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested'A/4/'loaeGL <br />Does turbine shut down when <br />l / <br />/G" <br />/3 <br />W�fc�-LcLI7" <br />Dr <br />Gve�L�,,.�c. �� <br />�jq�y. j.�►i <br />UDC sensor detects liquid (both`i'es <br />product and waterfl* <br />No ❑ NA <br />! \\ <br />Yes ❑ No ❑ NA <br />❑ No ❑ NA <br />/LrYes ❑ No 11NA <br />Turbine shutdown res once time <br />Is system programmed for fail- <br />safe shutdown?` <br />wa C <br />Yes ❑ No ❑ NA <br />Nei- <br />es ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />es ❑ No ❑ NA <br /><Yes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />JWs ❑ No ❑ NA <br />Wait time between a lying <br />pressure/vacuum and <br />starting test <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria:oZ,5 <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />/a-� <br />9; / 5 <br />le-0�z elo <br />q <br />Q y%J.ue�, <br />p ' U <br />3a lYi,i� <br />❑Pass ail <br />es ❑ No ❑ NA <br />es ❑ No ❑ NA <br />lorYlnti� <br />.17 <br />40 <br />.' 5 5 <br />/J1,7t <br />I✓d G <br />oa s" 1on,� <br />Pass ❑ Fail <br />es ❑ No ❑ NA <br />es ❑ No ❑ NA <br />T $ d <br />44 -e4 --v <br />/ D; v� <br />�o 7_1 5 <br />, Dl1> <br />�ooS Sv/n <br />❑ Pass LhZail <br />es ❑ No ❑ NA <br />)<Yes ❑ No ❑ NA <br />` 21 <br />— <br />d ,' D S <br />DT�`r•*�G' <br />,v v �„- <br />: ao5 36 <br />Pass ❑ Fair <br />❑ No ❑ NA <br />es ❑ No ❑ NA <br />Comments — (include information on re airs made rior to testin , and recommended follow -u for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.