My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page 6 of <br />8. <br />FILLRISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sumps <br />Fill Riser Containment Sumps are Present, but were Not Tes <br />est Method Developed By: <br />U Sump Manufacturer U Indus" Standard U Professional Engineer <br />U Other (Sped) <br />Test hod Used: <br />U Pressure U Vacuum U Hydrostatic <br />u other (spm. fyI <br />Test Equipme Used: <br />Equipment Resohrtiom- <br />Fill Sum # Fill Sum # um Fill S # Fill Sump # <br />Diameter <br />Sum fl}: <br />Height from Tank Top to Top o <br />�� <br />Hi hest Piping Penetration: <br />i <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testiri : <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: <br />Initial Reading Rr): <br />Test End Time: <br />Final Reading LRF): <br />Test Duration: <br />Change in Reading, RF- <br />Pass/Fail Threshold or Crtteri <br />��ttyl ll-+ Iii 7f,tY�f71fi1 ii1'Il + i!Yi!?y!7!1 !.i!7.tL++1f+fit• +++77.117 LA1 -ill' LL- t I t u 1 L+.+ <br />���` i.•G riji �;�, '� � 7'�' }�}yj•}Q.jt�}'1[,� } } _{� i ! 'if. s ti _tu v <br />Is there a sensor in the p? <br />U Yes U No ll Yes U No U Yes U No U Yes U No <br />Does the sensor ala when <br />either product or ater is <br />�, <br />U Yes U No U NA U Yes U No U NA U Yes U No U NA U U No U NA <br />detected? <br />Was sensor moved for testing? <br />U Yes U No U NA U Yes U No U NA U Yes U No U NA U Yes U U NA <br />Was or properly replaced and <br />U Yes U No U NA <br />verified functional after testing? <br />U Yes U No U NA U Yes U No U NA U Yes U No U 1 <br />Comments — (include information on repairs made prior to testing; and recommended, follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.