My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0079782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALLEN
>
19155
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0079782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 3:04:18 PM
Creation date
11/29/2018 2:51:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0079782
PE
4201
STREET_NUMBER
19155
Direction
E
STREET_NAME
ALLEN
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24507081
ENTERED_DATE
10/25/2018 12:00:00 AM
SITE_LOCATION
19155 E ALLEN RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
DAfonskaia
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SINGULRIR o <br /> OPERATING CONDITIONS <br /> Total holding capacity of the system shall provide a minimum of 48 hour retention of the daily flow. The pretreatment chamber <br /> shall provide at least 18 hour retention,the extended aeration chamber shall provide at least 24 hour retention and the clarification <br /> chamber shall provide at least 6 hour retention. The non-mechanical flow equalization device shall increase each individual <br /> chamber and total system retention time in direct proportion to loading. Design of the system shall include a compartmented <br /> tank and non-mechanical flow equalization device to insure successful treatment performance without upset even when the <br /> significant runoff period is six hours. Hydraulic design considerations of the system and flow equalization device shall be such <br /> that intermittent peak flow factors as high as four shall not upset hydraulic reliability within the system. System performance in <br /> compliance with the requirements of NSF Standard 245 shall be recognized by an ANSI accredited third-party laboratory and be <br /> approved for use by the local governing regulatory agency. <br /> PRETREATMENT CHAMBER <br /> The pretreatment chamber shall be an integral part of the wastewater treatment system. All domestic wastewater shall be <br /> preconditioned and flow equalized while passing through the pretreatment chamber prior to being introduced to the extended <br /> aeration chamber. The outlet of the pretreatment chamber shall be equipped with a discharge tee that extends vertically into the <br /> liquid so that only the preconditioned equalized flow from the center area of the chamber is displaced to the extended aeration <br /> chamber. The discharge tee and transfer port shall be of adequate size to handle a peak flow factor of four without restricting the <br /> outlet and disturbing hydraulic displacement to the extended aeration chamber. A removable inspection cover shall be cast into <br /> the top of the pretreatment chamber to allow tank and transfer tee inspection. As a safety measure,the uncovered opening shall <br /> be small enough to insure that the tank cannot be entered for inspection or service. <br /> ALTERNATE INLET REMOVABLE INSPECTION COVER <br /> LOCATION III WITH CAST-IN-PLACE HANDLE <br /> I <br /> r— —_—_--T_I 7f 7 <br /> AERATOR MOUNTING CASTING <br /> CAST-IN-PLACE PRETREATMENT I I i� AND COVER WITH FRESH AIR <br /> CHAMBER TRANSFER TEE i VENT ASSEMBLY <br /> II II I <br /> I II II / I <br /> BIO-KINETIC SYSTEM <br /> PRETREATMENT ] <br /> CHAMBER — III �I I Ixi �7i1 1 li—�i <br /> I 1 I Cd <br /> INLET LINE I I <br /> BIO-KINETIC SYSTEM MOUNTING <br /> I CASTING AND COVER <br /> ALTERNATE INLET _ _________1L___ <br /> LOCATION BIO-STATIC SLUDGE <br /> II RETURN <br /> EXTENDED AERATION PLAN VIEW FINAL CLARIFICATION <br /> CHAMBER CHAMBER <br /> AERATION CHAMBER <br /> The extended aeration chamber shall provide in excess of 24 hour retention of the equalized daily flow. The chamber shall be of <br /> sufficient size to provide a minimum of 80 cubic feet of tank capacity per pound of applied BOD. The aeration chamber <br /> length-width-depth ratio shall be designed to insure uniform tank mixing and provide optimum treatment. The aeration chamber(s) <br /> shall be an integral part of the system flow path and constructed of properly reinforced 5,000 PSI,28 day compression strength <br /> precast concrete. All castings used to construct the precast concrete tankage shall be monolithic units with external and <br /> internal walls incorporated into each section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.