My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0079782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALLEN
>
19155
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0079782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 3:04:18 PM
Creation date
11/29/2018 2:51:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0079782
PE
4201
STREET_NUMBER
19155
Direction
E
STREET_NAME
ALLEN
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24507081
ENTERED_DATE
10/25/2018 12:00:00 AM
SITE_LOCATION
19155 E ALLEN RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
DAfonskaia
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL CLARIFICATION CHAMBER <br /> The final clarification chamber shall consist of 5 functionally independent zones operating together to provide satisfactory <br /> settling and clarification of the equalized flow. An inlet zone shall be provided and shall dissipate transfer turbulence at the flow <br /> inlet of the clarification chamber. Its performance shall also eliminate turbulence in other zones of the clarifier. Liquid shall be <br /> hydraulically displaced from the inlet zone to the sludge return zone. Hydraulic currents shall sweep settled sludge from the <br /> hoppered walls and return these solids via the inlet zone to the aeration chamber. As solids are removed,liquid is displaced to <br /> the hopper zone of the clarifier. In this zone,settling by gravity takes place. Three of the four sidewalls are slanted to form a <br /> hopper which directs all settled material back to the <br /> sludge return zone. Clarified liquid from the hopper OPTIONAL AERATOR FRESH AIR VENT ASSEMBLY <br /> zone shall be displaced into the final settling zone to EXTENSION RISER <br /> P 9 OPTIONAL BLUE CRYSTAL <br /> provide additional clarification of the liquid. The liquid SINGULAIR AERATOR CHLORINATION SYSTEM <br /> is finally displaced to the outlet zone for final filtration AERATOR OPTIONAL BIO-NEUTRALIZER <br /> and discharge from the system. Non-mechanical MOUNTING CASTING DECHLORINATION SYSTEM <br /> equalization of the flow, through all 5 independent UNDERGROUND POWER _ _ OPTIONAL BIO-KINETIC <br /> SUPPLY CABLE TOSINGULAIR SYSTEM EXTENSION <br /> zones,shall provide optimal settling and clarification. CONTROL CENTER RISER <br /> PRETREATMENT ° BIO-KINETIC SYSTEM <br /> BIO-STATIC® SLUDGE RETURN ACCESS COVER ® ° MOUNTING CASTING <br /> e -e <br /> A Bio-Static sludge return shall be installed into the — = FLOW LINE o <br /> cast-in-place opening(s) in the aeration/clarification EFFLUENT LINE <br /> chamber wall to provide positive return of settled solids. INLET LINE <br /> Aeration chamber hydraulic currents shall enter the a BIO-KINETIC SYSTEM <br /> sludge return(s)and be directed into the sludge return <br /> zone of the clarification chamber. The Bio-Static sludge PRETREATMENT ° CLARIFICATION <br /> CHAMBER CHAMBER <br /> return shall accomplish resuspension and return of <br /> settled solids without disturbing the clarified liquid in <br /> EXTENDED AERATION SECTION VIEW BIO-STATIC SLUDGE <br /> the final settling zone and outlet zone. CHAMBER RETURN <br /> MECHANICAL AERATOR <br /> Each Singulair aerator shall be installed in a concrete aerator mounting casting above the aeration chamber. Fresh air shall be <br /> supplied through a molded plastic vent assembly cast into the concrete access cover above the aerator. The Singulair aerator <br /> shall include plated mounting brackets,NEMA6 rated electrical connector,UL recognized fractional horsepower motor,molded <br /> plastic lifting handle, molded plastic air intake screens, <br /> LIFTING HANDLE FRESH AIR VENT ASSEMBLY molded plastic foam restrictor,stainless steel aspirator shaft <br /> and molded glass-filled nylon aspirator tip. The motor shall <br /> VENT ANTI-ROTATION contain recision manufactured o-ring type seals installed <br /> MOISTURE RESISTANT LUGS P 9 YP <br /> ELECTRICAL CONNECTOR between the motor shell and the machined aluminum endbells <br /> AERATOR BRACKET to insure watertight integrity is maintained. Molded Viton <br /> MOUNTING GROOVE elastomer shaft seals shall be utilized to protect the bearings <br /> VENTED COVER p <br /> from contamination. Only the stainless steel aspirator shaft <br /> and glass-filled nylon aspirator tip shall be installed in contact <br /> UNDERGROUND _ with the liquid. There shall be no submerged electrical motors, <br /> POWER CABLE. Q_ OPTIONAL AERATOR <br /> ROUTE DIRECTLY ° RISER CASTING bearings or fixed air piping in the aeration system. Singulair <br /> TO EDGE OF TANK. Q ° <br /> DO NOT ALLOW CABLE - e Q aerator motors shall be designed not to exceed the motor <br /> TO CROSS INSPECTION <br /> COVER ON TANK TOP. ° ce nameplate rating when installed and operated as <br /> AERATOR MOUNTING recommended for the system. The fractional horsepower <br /> ower Y p <br /> aerator motor shall be equipped with a foam restrictor to <br /> GROUT OR SYNTHETIC protect the motor against high water and foam. The motor <br /> SEAL MOUNTING <br /> CASTING AND POWER shall be 4 pole, 1725 RPM, 115 volt,60 Hertz,single phase, <br /> CABLE ENTRANCE. SINGULAIRAERATOR ball bearing constructed with a 1.0 service factor. It shall <br /> DESIGN FLOW LINE draw less than 4.0 amps when operating at the rated <br /> AERATION CHAMBER FOAM RESTRICTOR nameplate voltage. Aerator motors without LIL recognition <br /> have not demonstrated compliance with international <br /> electrical standards for safety and reliability and shall not be <br /> ASPIRATOR SHAFT ASPIRATOR TIP considered for this application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.