My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 1986 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 11:20:16 AM
Creation date
12/4/2018 11:09:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2001
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response - City has contracted with `Afford-A-Test" of Thornton to conduct the required <br /> testing. Testing is scheduled for this week and the results will be forwarded as soon as <br /> possible, however, they may not be available by June 91 th as requested. <br /> Item #4 - Dispose of liquid in piping sumps and submit verification by June 11th. <br /> Response - City had Norcal Oil, Inc. remove the liquid on June 5h. If this letter is not <br /> sufficient verification, additional documentation can be forwarded to you. <br /> Items #5 - Perform tank integrity test with tank in operating condition by June 4th and <br /> submit results by June 11 th. Response - "Afford-A-Test"has been retained to perform <br /> test this week. Results will be forwarded as soon as possible, however, results may not <br /> be available by June 11th. <br /> Item # 6 - Maintain monitoring log for each UST and submit copy of log for the month of <br /> May 1998 by June 11th. Response - Monitoring had been occurring on a regular basis, <br /> however, no log had been maintained. Starting at the end of May, a weekly log was <br /> started. A copy of this log for each UST is attached. <br /> Item #7 - Submit by June 4" verification that the cathodic protection system was tested. <br /> Response - Testing was conducted on June 5h. Results will be forwarded as soon as <br /> they are available. <br /> Item #8 - Upgrade overfill protection to comply with current regulations. Submit <br /> application to upgrade before work is started. Response - the manufacturer will be <br /> contacted to determine if modification of the existing overfill protection can be made in <br /> order to bring it into compliance with current regulations. <br /> The report for 1331 S. Ham Lane listed seven (7) items. The following responses are <br /> provided to those seven items: <br /> Item #1 - Submit by June 5th an application to install a probe in the piping sump, restore <br /> the power to the level alarm panel and replace the cap on the riser used to contain the <br /> level probe. By June 12th, submit verification to this office that the monitoring equipment <br /> has been checked. Response - Shields-Harper performed inspection on June 5h to <br /> determine the work needed to comply. Also, placed call to Eric Travena to obtain copy <br /> of required application. In response, Mr. Travena left a message saying he would mail <br /> the application. The work required will be completed as soon as possible. <br /> Item #2 - Test leak detection monitoring equipment by June 5" and submit verification <br /> by June 12th. Response - Contracted with Shields-Harper to conduct required testing. <br /> Testing conducted on June 4th and written verification is attached. <br /> Item #3 - Perform annual line test by June 5th and submit results by June 12th <br /> Response - City has contracted with "Afford-A-Test" of Thornton to conduct the required <br /> testing. Testing is scheduled for this week and the results will be forwarded as soon as <br /> possible, however, they may not be available by June 11th as requested. <br /> Item #4 - Submit by June 5th verification that the cathodic protection system was tested. <br /> Response - Testing was conducted on June 5h. Results will be forwarded as soon as <br /> UST <br />
The URL can be used to link to this page
Your browser does not support the video tag.