Laserfiche WebLink
SVaCB,January 2002 Page—of <br /> SECONDARY PIPE TESTENG <br /> Test Method Developed By <br /> Piping Manufacturer <br /> i�lndustry Standard Professional <br /> neineer <br /> ZI Other(Specify) <br /> I Test Method Used: ePressure 71 vacuum LI Hydrostatic <br /> E Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> P�g g ggz'4 !2tR <br /> Pi in Run Piping Run# Piping Run# Pip <br /> ing Run# <br /> MIN :Pi <br /> Piping Material: <br /> Piping Manufacturer-. <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation- <br /> Wait time between appfo% <br /> pressure/vacuum/water and Mi <br /> stamng test: <br /> Test S=Time: 3 <br /> Initial Reading W: <br /> Z <br /> Test End Time: <br /> Final Reading(14): <br /> Test Duration: <br /> Change in Reading(ROW: <br /> Pass/Fail Threshold or <br /> Criteria- <br /> Pass iD FA .0 PASS 0 Fag; P=&. U Fag:, <br /> Comments—(include information on repairs made prior to ife-Wng, and recommended follow-up.for failed teas) <br />