My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, 7amuary 2002 Page of <br /> 5. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer A dustry Standard C Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Q Pressure 17,Vacuum drostatic <br /> C'Other(Specify) <br /> Test Equipe a Used: Egtripment Resolution: <br /> Y <br /> Sump# Sump#ry Sump# Sump# <br /> Sump Diameter- <br /> Sump D <br /> Strap Materw- <br /> from Tank Top to Top of <br /> Pene�raiioa: <br /> Height from Tank Top to Lowest <br /> Elec cal Penetration: �. <br /> Condition of smp prior to testing <br /> Portion of Sump Tested' / <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Q Yes Q No L-4,-�d ❑Yes C No Q Yes G No ONA C Yes ❑No CNA <br /> and water <br /> Turbine shutdown response tune <br /> Is system progantmed for safe <br /> shutdown??. Eml- Q Yes Q No <br /> li�<A C Yes Q No �JA Q Yes 0N C Yes C No CNA <br /> Was fat?-safe vesifie to be ❑yes ❑No Z4A A Q Yes ❑No & ❑Yes Q No a�4A Q Yes F,No Q NA <br /> o ationai? . <br /> Wait time between applying <br /> Pe test /d �f <br /> Test Start Tune: <br /> Idtial Reading(R4): <br /> Test End Time: 3 r Q d <br /> Final Reading(14): <br /> Test Duration B d/f JA <br /> Change in Reading(Rs,-R4): <br /> PassiYad Threshold er Criteria. <br /> lai} <br /> Was senor removal for testing? es ❑No ❑NA ❑No ❑NA ❑Yes 'Q No ❑NA Q Yes- ❑No DNA <br /> Was sensor properly replacad and Vy es ❑No 0 NA es ❑No CNA ❑Yes ❑No ❑NA C Yes ❑No ❑NA <br /> verified fimctional ager <br /> Comments-(mclude mfonnation on repairs made prior to testing, and re=wnended foflow-uF for fMled tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asst isic(*)is"NO"or"NA", the entire sumo must be tested (S�SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.