Laserfiche WebLink
SWRCB, January 2002 <br /> Page <br /> b. ER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Meilied Developed By: ❑UDC Manufacturer 0 Industry Standard ❑P.rofessiorial Engineer <br /> - 0 Other(Specify) <br /> Test Method Used D Pressure C Vacuum 0 Hydrostatic <br /> C Other(Specify') <br /> Test Equipment Used. Eq*ment Besohrtiom: <br /> UDC# UDC# UDC# IIDC# <br /> UDC Mmurf cairer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of 16ghest Piping Penetration: <br /> Height fi-om LDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Portion of UDC Tested <br /> Does turbine shW down when <br /> UDC sensor detects liquid(both C Yes C No 131- <br /> Dyes ONoXNAz C Yew C No CNA C Ycs 024o O NA <br /> oduct and wzux)?' <br /> Turbine shutdown response time <br /> Is system Ftogratumedforfail- <br /> sole shutdown? C Yes D No�a NA C Yes 0 No DNA C Yes C No DNA ❑Yes D No CNA <br /> Was verified to be C Yes D No ❑NA C Yes C No DNA C Yes C No C NA 0 Yes D No C NA <br /> 0 onal7 <br /> Wait time between applying <br /> pr and <br /> sawting test <br /> Test Start Time: <br /> In tW ): <br /> Test End Time: <br /> lanai Raiding(14): <br /> Test Duration: <br /> Cbange in <br /> Pass/Fail Threshold or Criteria: <br /> Was sensor removed,for testing? C Yes D No 'INA [ Eyes ONO !D NA C Yes 0 No C NA 0 Yes C No 0 NA <br /> Was sensor properly replaced and C Yes D No 0 NA C Yes 0 No CNA C Yes 0 No C NA 0 Yes 0 No C NA <br /> verified Factional after 7 <br /> Comments—(include information an reparn made prior to testing, and reconunendedfollow-up for furled tests) - <br /> If the entire depth of the UDC is not tested, specify how nnich was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or SIA the entire UDC est be tested. (See SWRCB LG 160) <br />