Laserfiche WebLink
SWRCB J 2002 r <br /> January Page of <br /> S. SPiLLIOVERFILL CONT_PMENT BOXES <br /> Facility is Not Eqiipped With Sp"00vertill Contain t Boxes ❑ <br /> SpiiUOverfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By-. ❑ Spill Bucket Manufacturer D Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Uu& Egt*mient Resohition: <br /> SPM Boz# SPM Box# Spm Boa# Spw Boz# <br /> Bucket Diameter: <br /> Bucket Death: <br /> Wad time between Vp ring <br /> and <br /> starting test: <br /> Test Start Tinge: <br /> Initial Reading W: <br /> Test End Tune: <br /> Final Reading X): <br /> Test Duratiom: <br /> Change in Rearing(Rj R j): <br /> Pass/Fad Th.Mhald or <br /> Criteria <br /> Comments—(include in.formation on remum made prior to tearing, and rec ommended follow7- p for failed!ests) <br />