My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: -j Piping Manufacturer � dustry Standard a Professional Engineer <br /> J O er(Specify) <br /> Test Method Used: 6Pressure 0 Vacuum ❑Hydrostatic <br /> G-Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> A �rJ' ��T �'�� �"� �r1 r.. -m iY :•.-..✓-.t 'YL2�'.NL..wi.Y:r:.:A�,a Y.Yr=new.. ..:K ^r ; , ; k9 } Piping Run# Piping Run Piping Run # Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: '7 ' <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: Z�, < r, <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: p'Gy I <br /> Final Reading(R£): -rz Ox <br /> Test Duration: <br /> Change in Reading 04-n: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> :`Test Result ass €<Parl Ct:`Pass ::a�fail a.Pass C. P'a El;Pais <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.