Laserfiche WebLink
SWRCB, January 2002 Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: -j Piping Manufacturer � dustry Standard a Professional Engineer <br /> J O er(Specify) <br /> Test Method Used: 6Pressure 0 Vacuum ❑Hydrostatic <br /> G-Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> A �rJ' ��T �'�� �"� �r1 r.. -m iY :•.-..✓-.t 'YL2�'.NL..wi.Y:r:.:A�,a Y.Yr=new.. ..:K ^r ; , ; k9 } Piping Run# Piping Run Piping Run # Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: '7 ' <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: Z�, < r, <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: p'Gy I <br /> Final Reading(R£): -rz Ox <br /> Test Duration: <br /> Change in Reading 04-n: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> :`Test Result ass €<Parl Ct:`Pass ::a�fail a.Pass C. P'a El;Pais <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />