Laserfiche WebLink
SWRCB, January 2002 <br /> • Page of <br /> ' S. PIPIlYG StiiVIP TES M; G <br /> Tes# Method Developed By: 0 Sump Manufacturer 94sl6ustry Standard 0 Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum ydrostatic <br /> C Other(Specify) <br /> Test Equipment Used Equipment Resolution: <br /> 5�+r�2`. �.r� t. ��..:. '. ...u4::4',:en _. •.:fr...:x?-'-. <br /> r � .. .' ::'W;a'::t%:._�',.p'.L--;.,%=(:`ti`.'r',.7.<c•. t:d-.*, <br /> , Lvy��zr� : Sump# Sump# Sump # Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: 44 r <br /> Height from Tank Top to Top of ! i� <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest r/ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: - <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes 0 No i A 0 Yes ❑No 0 NA 0 Yes a No 0 NA ` ❑Yes 0 No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown? J ON/A❑No A 0 Yes ❑No 0 NA 0 Yes C No 0 NA ❑Yes 0 No C NA <br /> Was fail-safe verified to be 0 Yes 0 No A 0 Yes ❑No ;0 NA 0 Yes 0i No 0 NA ❑Yes <br /> o 0 No 0 NA <br /> operational?*. <br /> Wait time between applying <br /> pressureJvacuum/water and starting f j'✓1 <br /> test: <br /> Test Start Time: <br /> Initial Reading(RO: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: D , <br /> Change in Reading(RF-&): <br /> Pass/Fail Threshold or Criteria: <br /> . <br /> est °esult- <br /> Pass.:. I1 FsiE. 1 .Pass O..Fait ' D;:Foss :Pass: . G Fail .. <br /> Was sensor removed for testing? ie 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes ❑No 0 NA ❑Yes 0 No DNA <br /> Was sensor properly replaced and Pj/Y 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA ❑Yes 0 No 0 NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is`N- O" or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />