Laserfiche WebLink
SWRCB, January I 2002 Page Of <br /> SECONDARY PIPE TESTING z <br /> Test Method Developed By: Piping Manufacturer dustry Standard :1 Professional Engineer <br /> 9�ther(Specify) <br /> Test Method Used: I—Pressure El Vacuum 0 Hydrostatic <br /> �]Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> ........... <br /> Piping Run 4 Piping Run# Piping Ran # Piping Run 4 <br /> Piping TvLaterial: <br /> Piping Manufacturer: <br /> Piping Diameter <br /> Length of"Piping Run: <br /> Product Stored: <br /> .Method and location of <br /> piping-nm isolation: <br /> Wait time between applying V <br /> premure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(P-4): <br /> Test End Time: <br /> Final Reading(R+): <br /> Test Duration: <br /> Change in Reading(RF-P.4): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> [:Test Result Huss-. 11Fadi:. . 01 pise G_ Fiffk 0 PMR.. 0. Pan. Q:Fa <br /> Comments— (include information on repairs made prior to testing, and recommended foilgw-mpfor failed tests) <br />