Laserfiche WebLink
SWRCB,January 2002 Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: 11 Piping Manufacturer ;7Rdustry Standard D Professional Engineer <br /> 11 Other Specify) <br /> Test Method Used: V-Pressure 1:1 Vacuum El Hydrostatic <br /> 11 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> 10 M.,�11 R <br /> ON Iy Piping Run 9 Piping Run# Piping Run# 3 Piping Run# <br /> Piping Material: F- C�- <br /> Piping Manufacturerx" <br /> Piping Diameter: -3 // <br /> Length of Piping Run: or <br /> Product Stored: <br /> Method and location of <br /> piping-ran isolation: )6e')e7l", 10 r` ,e/ <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: / <br /> Test Start Time: L,57 91 0 <br /> Initial Reading(Fq): <br /> Test End Time:-, <br /> Final Reading(RF): <br /> S <br /> Test Duration- <br /> Change in Reading(RF-R& <br /> Pass/Fail Threshold or <br /> Criteria: <br /> 3' esuYt: Pass El. A 11-:P <br /> F 11 PASS 9*. CIfail <br /> COMMents— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Z, <br /> '7— 7- <br />