My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed: <br />r]mmnlu*n fho fMlu ... ; ..h,.,.�r..a. <br />122.00 <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. comments: ALL PASSED ARIS ON SITE <br />Monitoring System Certification Page 2 of 4 2,22 <br />1/07 <br />ible alarm operational? <br />al alarm operational? <br />IF; <br />sensors visually inspected, functionally tested, and confirmed operational? <br />Eo�perati.l�n? <br />sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with1proper <br />? <br />C Yes <br />❑ No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />E N/A <br />I� Yes <br />❑ No' <br />❑ N/A <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />fails to operate, or is electrically disconnected? If yes: which sensors initiate shut <br />positive -down? (Check all that apply) E Sump/Trench <br />Sensors, E Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? E Yes: ❑ No. <br />E Yes <br />❑ No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />❑ N/A <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? 90% <br />❑ Yes <br />® No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />1—]Yes' <br />E No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product, D Water. If yes, describe causes in Section, E. below. <br />E Yes <br />❑ No' <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />❑ Yes <br />E No' <br />Is all monitoring equipment operational per manufacturers specifications? <br />In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. comments: ALL PASSED ARIS ON SITE <br />Monitoring System Certification Page 2 of 4 2,22 <br />1/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.