My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page of <br />Test Method Developed By: ❑ Sump Manufacturer ; Industry Standard X Professional Engineer <br />i.. Other (Specify) <br />Test Method Used: _ Pressure , Vacuum X Hydrostatic <br />1_: Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />�i �; «• Sump # 1-87-M <br />Sump Diameter: 42" <br />Sump # 2-87-S <br />Sump # 3 -Diesel <br />Sump # <br />42" <br />46" Hexagon <br />Sump Depth: <br />40" <br />41" <br />41 't/z" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />16" <br />10" <br />21 %z" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />10" <br />10" <br />18" <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 18" <br />Water Line 13" <br />Water Level 23 %z" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes <br />Yes <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe <br />shutdown?' <br />Yes <br />Yes <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />No <br />No <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />11:17 <br />11:12 <br />11:50 <br />Initial Reading (Ri): <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />11:47 <br />11:42 <br />12:20 <br />Final Reading (RF): <br />.001 <br />> .030 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): <br />0 <br />> .030 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />Pass <br />*Fail <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Yes <br />Yes <br />COMMIAS — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />*Piping Sump #2 Regular 87 Siphon will not maintain test level and has a gross loss of >.030 in 5 minutes <br />I reset the Level Change Indicator 3 times to verify consistent loss rate. <br />Found Electrical Conduit Penetration on South wall for the Cathodic Protection Wiring to be breached. <br />Recommend a repair contractor be consulted. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.