My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO_2011 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:42:16 PM
Creation date
12/6/2018 9:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2018
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />4. T.INK ANNULAR TESTING <br />Page of <br />Test Method Developed By: -1 Tank Manufacturer Industry Standard Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ] Pressure -1 Vacuum ❑ Hydrostatic <br />L! Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />Tank # 1 Tank # 2 Tank # 3 Tank # <br />Is Tank Exempt From Testing? <br />No <br />No <br />No <br />Tank Capacity: <br />10K <br />2K <br />5K Gallon <br />Tank Material: <br />Double Wall Steel <br />Double Wall Steel <br />Double Wall Steel <br />Tank Manufacturer: <br />Perkins Welding <br />Perkins Welding <br />Perkins Welding <br />Product Stored: <br />Regular 87 Master <br />Regular 87 Siphon <br />Diesel <br />Wait time between applying <br />vacuum and starting test: <br />*See comments <br />*See comments <br />*See comments <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time.. <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />COmmentS — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />*'Annular tanks not tested with this testing event. <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. (California Code of Regulations, Title 23, Section 2637(a)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.