Laserfiche WebLink
SWRCB, January 2002 <br />5_ SFC()NTIARV PIPV TFQ-j'rrrr <br />Page of <br />Test Method Developed By: X Piping Manufacturer C Industry Standard '7 Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum E Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-1 S Psi <br />Piping Run #3 Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />Approx. 35' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP <br />Piping Sump #3 <br />Wait time between applying <br />pressure and starting test: <br />5 Minutes <br />Test Start Time: <br />2:44 <br />Initial Reading (RI): <br />4 Psi <br />Test End Time: <br />3:44 <br />Final Reading (RF): <br />4 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />Test Result: <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) _ <br />With assistance of repair contractor, we replaced torn test boot on Diesel Secondary Pipe at UDC #4&5, prior to testing. <br />Note: Regular 87 Master and Regular 87 Siphon Secondary Piping not tested with this testing event. <br />