My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 10:53:10 AM
Creation date
12/7/2018 10:30:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra-Pacific Groundwater Consultants, Inc. Y Y <br /> Geologists, Engineers, and Compliance Specialists -, -LZ <br /> February 25, 1997t FE" 23 AM 11: 43 <br /> Ms. Wendy Wyels, Agricultural Regulatory Unit <br /> Central Valley - Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Subject: Analytical Data Table Corrections, Fourth-Quarter 1997 Monitoring Report, Former <br /> PureGro Facility at 1905 North Broadway Avenue, Stockton, PureGro Site No. 771165, <br /> Unocal Order/Contract: 34402-1, Sierra-Pacific Project No. 94-055 <br /> Dear Ms. Wyels: <br /> Thank you for reviewing the fourth-quarter 1996 Broadway Avenue Quarterly Monitoring Report <br /> thoroughly. The errors and omissions on Tables 3 and 4 arose from use of an un-edited computer data file <br /> in the assembly of the report. These errors were not present in the edited file which was found after receipt <br /> of your review letter. Data corrections are shaded (5%) on the enclosed tables for your convenience. The <br /> enclosed table corrections will be reflected in the First Semi-Annual 1997 Monitoring Report. <br /> We are scheduled to collect water samples at the Broadway site in March. The March sampling event will <br /> be the first sampling event since the down-gradient point-of-compliance well (MW-9) was installed and the <br /> evaporation ponds were paved. It will also be the first sampling event to follow a 100-year storm. <br /> We look forward to seeing you on site, and will notify you of our sampling schedule as soon as possible. <br /> Please call either John Rapp or me if you have additional questions or directives. <br /> Sincerely, <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> CML� <br /> Eric D. Chase, CEG <br /> Senior Engineering Geologist <br /> JSR/jb <br /> Enclosures <br /> C. Michael Infurna, San Joaquin County Environmental Health Department <br /> W.T. Nickerson, Unocal <br /> Jan Wagoner, Unocal <br /> Nancy Bishop, Western Farm Services <br /> John Rapp, Sierra-Pacific <br /> (916)933-1468 <br /> 4911 W indplay Drive,Suite 4 EI Dorado Hills.California 95762 (916)933-3197 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.