Laserfiche WebLink
1 <br /> 1 Geosyntec° <br /> consultants <br /> 1 4. SCHEDULING AND REPORTING <br /> 1 Investigation activities will be completed within 60 days of RWQCB approval of this <br /> Work Plan, continent upon driller availability. A report detailing the investigation and <br /> the soil and groundwater analytical results will be submitted to the RWQCB within 90 <br /> 1 days of completion of field activities. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 Work Plan Stockton Pond Inv-01-07-08 12 01.07.08 <br /> 1 <br />