Laserfiche WebLink
SWRCB,January 2002 <br /> Page la—of7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer IndustryStandard <br /> Professional Engineer <br /> ❑Other(Sped) �. <br /> Test Method Used: ❑Pressure ❑Vacuum <br /> Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used <br /> qutpment Resolution:(ad, y <br /> S4.. <br /> rk•.ck +w .Ea . °. v <br /> C Manufacturer. VL � UDC# UDC <br /> U.DC:9f# <br /> L/ UDC#..I/ <br /> 5 <br /> UDC Material: i-rt <br /> UDC De the <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: r 0<< <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> c• <br /> Condition of UDC prior to <br /> testing: D <br /> Portion of UDC Tested i fine- <br /> Does <br /> Does turbine shut down when °r 1 <br /> UDC sensor detects liquid(bothxYes ❑No ❑NA 'XYes ElNo 11NA Yes ❑No ❑NA /a'Yes ❑No ❑NA <br /> roduct and water)?* /� <br /> Turbine shutdown res onse time a Ct,-,C,�t- *j u <br /> Is system programmed for fail- <br /> safe shutdown?' 'es ❑No ❑NA Yes O No ❑NA19,Tes ❑No ❑NA es ❑No ❑NA <br /> Was fail-safe verified to b-l- <br /> ope donal?* <br /> o eradonal?* ❑Yes 014o ❑NA ❑Yes )NVo ❑NA ❑Yes /Io ❑NA ❑Yes >�f4o ❑NA <br /> Wait time betwee g <br /> pressure/vacu water d <br /> starting test L d t�� i u: rtr. 10 rn u -rS 5 <br /> Test Start Time: 1 S 3, I <br /> D P�� rt�.K-� —�5 lU r� I -� <br /> Initial ReadinI^ ^° <br /> I � !"d g �l�-GE,n ��✓S� Li✓'L`�:' �i�5 l�2-c( �''i,5� G2L (� <br /> Test End Time: Z., of 3 : q. 9:,2 <br /> Final Reading <br /> (RF): �r'?.5"�."G'.�.G,� e4 s�--G6vt� ��s-�Gv�lz. <br /> Test Duration: <br /> m v� G ►,,.r►,k <br /> Chan a in Reading(RF-RI : s�o �I c�,�-� Q p �..,- <br /> Pass/Fail Threshold or Criteria: 161 tr,Ir i rv"',_ c ; 10 tu,) i 3 w�✓i let c ;h 30 rwsn- <br /> Test Result: Pass ❑Fail Pass ❑Fail Pass 11 Fail Pass ❑Fail <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA <br /> Was sensor properly replaced and . <br /> verified functional after testing? es ❑No ❑NA 4'es ❑No ❑NA )Ms ❑No ❑NA AYes ❑No ❑NA <br /> Comments—(include..information on repairs made prior to testing and recommended follow up for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />