Laserfiche WebLink
Monitoring System Certification <br />Site Address: <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Conviete the 161 inp, checklist: <br />Date of Testing/Servicing. <br />Yes <br />❑ No* <br />Is the audible alarmoperational? - -- - <br />❑ No* <br />Is the visual alarm rational? <br />❑ No* <br />Were all sensors visually fumetionally tested; and confirmed rational? <br />091"Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their proper operation? <br />❑ Yes <br />❑ >cO <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />N/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut dawn if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate. or is Oectrically disconnected? If.yes: which sensors <br />initiate positive shut -down? (Check all that applv) ump/Trench Sensors; C�bispenser Containment <br />Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? l3 Yes; ❑ No. <br />❑ Yes <br />❑ N� * <br />For tank systems that utilize the monitoring system as the primary tank overfill warming device (i -e. mo <br />C3'l�IIA <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill int(s) and operating ? If so, at what percent of tank capacity does the alarm tri l ?T-?% <br />❑ Yes* <br />o <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the manufacturer name and model for all replacement parts in Section E. below. <br />❑ Yes* <br />o <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product ❑ Water. If ves. describe causes in Section E. below. <br />❑ No* <br />Was monitoring stem set reviewed to ensure proj= settinp? <br />Yes <br />❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />