My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO 2004 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:58:25 AM
Creation date
12/13/2018 3:43:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2012
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: <br />F. In -Tank Gauging / SIR Equipment: <br />Date of Testing/Servicing: <br />❑ Check this box if tank ganging is used only for i;rventori control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />C fete the Nil ing checklist: <br />Q No* Has all input wiring been inspected for proper entryand termination, including testing for ground faults? <br />es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ No Was accuracy of system product level readings tested? <br />❑ No* Was accuracy of system water level readings tested? <br />❑ No* Were all probes reinstalled properly'? <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist, completed? <br />* In the Section H, below, describe haw and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />ramurete the. fnllawinQ checklist <br />❑ Check this box if LLDs are not installed <br />es <br />❑ No* <br />For equipment startup or annual ewpinent cejiffication, was a leak simulated to verify LLD performance? <br />u N/A <br />(Creek all that app Simataied leak rate: g.p.h.�; ❑ 0-1 g.mh.z; ❑ 0.2 o.P.h.z <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by Iocal agency. certification required only for electronic LLD start-up. <br />Y <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Q N/A <br />❑ Yes <br />❑ Flo* <br />For electronic LLDs, does the turbine antomatically shut off if the LLD detects a leak? <br />galIN/A <br />p Yes <br />❑ Ilio* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />i7i N/A <br />or disconnected? <br />❑ Yes <br />❑ Ne <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A <br />malfunctions or fails a tese <br />❑ Yes <br />Q o* <br />EN/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or wui ne corrmww <br />H. Comments: <br />Page 3 of 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.