My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO 2004 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:58:25 AM
Creation date
12/13/2018 3:43:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2012
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: <br />E. In -'Tank Gauging / SIR Equipment: <br />Date of Tesdng/Servicing: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank ;;auging or SIR equipment is installed. <br />Pus section must be completed it in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />©'Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults'? � <br />D'Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />4 M Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />Q'Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />ff Yes <br />❑ <br />No* <br />Were all probes reinstalled properly'? <br />a Yes <br />R ❑ <br />No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe bow and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed <br />G�'Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />iCheck all that apply) Simulated leak rate: 123 g.p.h.`:. ❑ 0.1 b.p.h.'; ❑ U.2 g.p.h.' <br />Notes: 1. Required for equipment start-up certification and annual certification. I <br />2_ Unless mandated by local agency, certification required only for electronic LLD start-up. <br />❑'Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements'? I <br />{ 2 -Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />+12'Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />Ip" WA <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />EY'N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />ig—N/A <br />malfunctions or fails a test'? <br />❑ Yes <br />❑ No* ' <br />For electronic LLDs, have all accessible wiring connections been visually inspectedl <br />a --N/A <br />es <br />Cl No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />I In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />M Comments: <br />Page 3 of 3 13/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.