Laserfiche WebLink
Veeder-Root Line Leak Application Guide <br />Specifications and Compatible Fluids Requirements <br />The table below lists Veeder-Root Line Leak Detector specifications. <br />SPECIFICATION <br />D- <br />OPERATING TEMP: <br />-25 TO +130T <br />-25 TO +130T <br />-25 TO +130°F <br />COMPATIBLE FUELS: <br />UNLEADED GASOLINE <br />UNLEADED GASOLINE <br />UNLEADED GASOLINE <br />LEADED GASOLINE <br />LEADED GASOLINE <br />LEADED GASOLINE <br />596 METHANOL / 9590 UNLEADED <br />590 METHANOL / 9596 UNLEADED <br />596 METHANOL / 95% UNLEADED <br />0 -1DO96 ETHANOL <br />0 -10090 ETHANOL <br />1090 ETHANOL / 9096 UNLEADED <br />1096 ETHANOL / 9096 UNLEADED <br />1090 ETHANOL / 90% UNLEADED <br />1596 MTBE / 8590 UNLEADED <br />15% MTBE / 8596 UNLEADED <br />1590 MTBE / 8596 UNLEADED <br />DIESEL <br />DIESEL <br />DIESEL <br />BIODIESEL (UP TO B100)1.2 <br />BIODIESEL (UP TO B100)1.2 <br />BIODIESEL (UP TO 13100)1 2 <br />KEROSENE <br />KEROSENE <br />KEROSENE <br />JET FUEL <br />JET FUEL <br />JET FUEL <br />AVIATION GASOLINE <br />AVIATION GASOLINE <br />AVIATION GASOLINE <br />LINE FLOW RATE: <br />120 GPM MAX. W/SWIFTCHECK VALVE <br />120 GPM MAX. W/SWIFTCHECK VALVE <br />120 GPM MAX. W/SWIFTCHECK VALVE <br />OPERATING RANGE: <br />0 - 70 PSI <br />0 - 70 PSI <br />0 - 70 PSI <br />PROOF PRESSURE: <br />200 PSI <br />200 PSI <br />200 PSI <br />MAX. VERTICAL PIPELINE HEIGHT <br />11 FEET <br />11 FEET <br />11 FEET <br />ABOVE TRANSDUCER: <br />MINIMUM PUMP OUTPUT PRES- <br />23 psi <br />23 psi <br />23 psi <br />SURES <br />tBiodiesel compliant with ASTM D7467 (up to B20) or ASTM D6751. <br />2Consult pump manufacturer for compatibility ratings on fuel blends greater than B20. <br />3Pump output pressure should be a minimum of 4 psi above the check valve's relief pressure. <br />Veeder-Root recommends that system software for the console be upgraded to the latest version when installing any new hard- <br />ware. For TLS -350 Consoles, when installing latest software, PLLD or WPLLD must be specified and customer must upgrade to <br />ECPU2 if not already installed. See Accessories/Upgrades section of price book or your local Veeder-Root authorized distribu- <br />tor for details. <br />