My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1245
>
2300 - Underground Storage Tank Program
>
PR0541906
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 4:03:26 PM
Creation date
12/13/2018 4:57:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0541906
PE
2351
FACILITY_ID
FA0024040
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1245
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1245 N MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
621
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q . <br />LEAK )DETECTION �r <br />S LL{:. <br />N <br />Exclusive Providers for MDleak® and PHDleak® Technologie", ;`� <br />1400 East Paseo Pavon • Tucson, AZ 85718 • Phone 855-255-5325 • F� X: 520.99-d:8�d5: <br />Sales@,LeakDetect.net v7ticv.LeakDetect.net <br />4. Small leaks are best left to LDT crews to pinpoint and have repaired, instead of the <br />contractor spending hours looking for little leaks. <br />5. Fast identification and leak location substantially reduces repair cost. <br />General: <br />1. Extraction plugs should be installed and sealed properly <br />2. A construction crew shall be onsite during the test period. This crew should be equipped to <br />repair any portion of the system. <br />3. The MDleak® method can test ping containing liquids. However if a liquid is present <br />additional time and cost will be incurred. <br />Product Piping: <br />1. The contractor shall have all shear valves plug or capped using steel not plastic fittings and <br />connected to the piping. <br />2. It is best to complete the turbine connections before the Pretest. Locating and repairing <br />fittings within the tank sumps during the pretesting is more efficient and less confining than <br />during the final testing. <br />3. Primary piping should be under test pressure when LDT arrives onsite. <br />Secondary Piping and Connections: <br />1. MDleak® does not require special fittings to be installed by the contractor. <br />2. The contractor should use standard approved factory secondary termination fittings or <br />boots. <br />3. Secondary piping should be under test pressure when LDT arrives onsite. <br />4. All termination secondary fittings shall include test ports. Test ports shall be accessible to <br />the LDT Technician. <br />Vent Piping: <br />1. Extraction plugs should be installed and sealed properly <br />2. Vent risers should not be caped and the contractor should be capable of working on the top <br />of the vent risers. <br />VR Piping: <br />1. Extraction plugs should be installed and sealed properly <br />2. VR piping at the UDC should also be caped or plug using steel not plastic fittings. <br />_author David Rabb 2of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.