Laserfiche WebLink
OPTION 2A <br />ARTICLE 3, SECTION 2633/2634 <br />MOTOR VEHICLE FUELS ONLY <br />CONSTRUCTION <br />' . Re i cements: �fC <br />. Approved tank construction material <br />Leak interception and detection system which complies with Article 3,,:)< <br />Section 2631(c). z <br />,C. Membrane liners must comply with Article 3, Secti6n 2633(e), (1), (2), <br />(3), (4),( 5) and are only allowed for piping systems (Department Policy) <br />Demonstrate that the leak interception and detection systems protects <br />ground water from contamination (Article 3, Section 2633(f), (1), (2), (3)9 <br />1-4)j (5), (6), (7). <br />O(< E. Pressurizeo.-piping systems must be installed with a leak detector that is <br />capable automatically shutting off the product pumps. <br />I. <br />singgle wall component "tank or piping" requires daily inventory <br />,- pr ; recoftciljiation and annual precision tests as part of the monitoring <br />program. J, - <br />F. Before covering, the tank(s) and system(s) must be tested to NFPA 30, <br />Standards. <br />G. Before use - the tank(s) and system(s) must be tested in accordance to <br />NFPA 329. <br />A Provide soil profile of vadose zone if membrane liners are used. <br />OPTION 28 <br />ARTICLE 3, SECTION 2634 <br />MOTOR VEHICLE FUELS ONLY <br />MONITORING <br />1. R quirements (leak interception and detection system(s)). <br />Floor must be constructed on a firm base and sloped to a <br />ok 'T B� Access casings must be installed in accordance to Article <br />2634 (c) (1 thru 6), (d) (1). <br />0� — C. Submit written monitoring and response plan as stated in <br />d� <br />rot Section 2634 (d) (1-3), 2634(e) (1-5). <br />See Hard wiring of electronic monitoring systems is required. <br />�Jjri E. Provide manufacturer's written installation instructions. <br />vee4 <br />Q K - <br />collection sump. <br />3, Section <br />Article 3, <br />