Laserfiche WebLink
Installation Guide Installation Procedure <br /> The Red Jacket <br /> FXV/FX2V detector <br /> O DO LM installs in this 2"port <br /> O <br /> 0 <br /> Tank vent port <br /> (remove plug to <br /> install vent tubing) <br /> 0 <br /> rjpumpsRxvports.eps <br /> Figure 1.FXV installation ports in The Red Jacket <br /> 3. Examine straight bore below two-inch thread for corrosion roughness. If found to be rough, smooth with <br /> fine emery paper. <br /> 4. Apply UL-classified non-toxic pipe thread sealant to the two-inch threads on the detector. Lubricate o-ring <br /> on the leak detector. <br /> 5. Screw the leak detector into the pump.Tighten with a wrench (top hex is 1-1/4 inch). <br /> 6. Installation of vent tube and snap tap connectors. <br /> For FX1 V models <br /> a. Remove 'A-inch pipe plug from tank test port in the Packer(on 6-inch Big-Flo applications, remove <br /> the 'A-inch pipe plug from the riser/flange assembly,for The Red Jacket pumps, see Figure 2). <br /> b. Apply a UL-classified non-toxic pipe thread sealant to the threads of the 1/4-inch NPT straight vent <br /> tube fitting and install in tank test port of the packer. On 6-inch Big-Flo applications,the 'A-inch NPT <br /> straight vent tube fitting may be installed into the riser/flange assembly. <br /> c. Apply a UL-classified non-toxic pipe thread sealant to the threads of the 1/4-inch NPT 90-degree vent <br /> tube fitting and install in the leak detector vent opening in the cap of the leak detector. <br /> d. Install the vent tubing into both fittings and tighten per instructions on package. <br /> JUN 3 0 2016 <br /> 3 <br />