My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231464
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 9:11:29 AM
Creation date
12/14/2018 4:34:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231464
PE
2361
FACILITY_ID
FA0000914
FACILITY_NAME
TIGER EXPRESS STORES
STREET_NUMBER
1399
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1399 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guide Installation Procedure <br /> r7V[m;TjT,T DO NOT wire submersible pumps to run continuously. Red Jacket line leak detectors will <br /> not perform leak tests on pumping systems that run continuously. <br /> ALL AIR MUST BE OUT OF THE SYSTEM FOR THE LEAK DETECTOR TO WORK <br /> PROPERLY. Before installing leak detector in the pump,fill the system with product by <br /> running the pump and delivering product from each dispenser(starting with the farthest <br /> from the pump and working to the pump) until all air is removed from system. <br /> Certain regulatory bodies require that leak detectors remain in the system after the lines have been installed. <br /> The lines may be purged of air by back-pressuring the lines with an inert gas, such as helium or nitrogen,to a <br /> pressure of 25 psi (172 kPa).This may be done at the impact valve under the dispenser.When this pressure <br /> has been reached, the leak detector will be in the open position, By turning on the pump and gradually <br /> bleeding the gas from the line through a valve at the impact valve of the farthest dispenser,the line may be <br /> purged of air. <br /> Installation Procedure <br /> Disconnect power to the submersible pump and relieve pressure before installing or <br /> removing petroleum equipment. <br /> 1. Disconnect power to pump at the load center. Tag or lock out the breaker to avoid the pump being turned <br /> on accidentally. <br /> 2. Remove the two-inch plug from the top of the Standard pump (see Figure 1 for The Red Jacket leak <br /> detector installation ports). If the two-inch plug is found to be so tight that cannot be removed,the <br /> submersible should be removed from the tank and placed in a vise. Remove the functional element <br /> assembly next to the pipe plug.The plug should then come out readily if a large pipe wrench is used. <br /> Replace functional element assembly securely and replace the pump in the tank. (See Step 3 before <br /> replacing pump). <br /> JUN 3 0 2016 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.