Laserfiche WebLink
Mr.M. Scott Mansholt—C1ie'Gron Environmental Management Cotporationk--) Page 5 <br /> Pombo Property—Soil and Groundwater Investigation Work Plan July 31,2003 <br /> i <br /> • A site map; j <br /> • Boring logs; <br /> • Analytical results; and <br /> • Copies of the laboratory certificates of analysis. <br /> i <br /> i <br /> SCHEDULE <br /> SAIC will begin this work two weeks after receiving a Notice to Proceed from <br /> ChevronTexaco and after obtaining the necessary clearances and permits described in this <br /> Work Plan. <br /> i <br /> We appreciate the opportunity to perform the proposed sampling and analyses, and look <br /> forward to your favorable consideration. Please call Luis Mercado at 916-979-3763 or <br /> Todd Del Frate at 916-979-3741 if you have any questions or need to discuss this Work f <br /> Plan in more detail. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION ���C G,i <br /> O <br /> D ANDR>:YU <br /> (�. DEL FR11TE NI <br /> N.� No.73% <br /> Luis Mercado Todd Del Frate, R.G. '9�►F �Q� <br /> F � <br /> O \ <br /> Project Manager Protect Manager R CAL <br /> w Attachments: <br /> Figure 1 - Location Map <br /> Figure 2 - Soil Boring Locations and Analytical Results from May& September <br /> 2002 Investigations <br /> i Figure 3 - Proposed and Selected Historical Soil Boring Locations <br /> i <br /> 1 <br /> j <br /> 1 <br /> I <br /> i <br /> t <br /> i <br />