My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231580
>
COMPLIANCE INFO 2012 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 2:41:11 PM
Creation date
12/21/2018 3:49:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2017
RECORD_ID
PR0231580
PE
2361
FACILITY_ID
FA0003963
FACILITY_NAME
TRACY76
STREET_NUMBER
2420
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
Tracy
Zip
95377
APN
23802006
CURRENT_STATUS
01
SITE_LOCATION
2420 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />uescrlptlon <br />Line #1 <br />Line 92 <br />Line #3 <br />Tank product <br />Gasoline - 87 <br />Gasloine - 91 <br />Diesel <br />Pipe manufacturer <br />Smith <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2 <br />2 <br />2 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />3 <br />Method of secondary pipe isolation <br />Test Boot <br />Test Boot <br />Test Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />150 <br />160 <br />170 <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) <br />Test start time <br />Initial pressure (psig) <br />Test end time <br />Final pressure (psig) <br />Test duration (hr:min) <br />Change in pressure (psig) <br />Pass/Fail threshold (psig) <br />TEST RESULT <br />Comments: <br />© 2012 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.